Tender Details
Particulars | Details |
---|---|
Title |
Bm Service Charges For Conducting Radiography (Non Destructive Test) On Welding Joints In Pressure Parts Of Unit 9 Boiler During Unit 9 Annual Overhaul Works.
|
Description |
Bm Service Charges For Conducting Radiography (Non Destructive Test) On Welding Joints In Pressure Parts Of Unit 9 Boiler During Unit 9 Annual Overhaul Works.
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 581695 |
Reference Number |
e-35/BM/SE/OM/KTPS/V/2024-25 |
Tender Fee | 31 |
EMD | 1307 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | March 18, 2025 01:30 |
End Date |
02/04/2025 ( Expired 68 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
In situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
In situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
Read moreAnnual maintenance contract (mechanical) of boiler, turbine with their auxiliaries for tpp and unit 9.
Annual maintenance contract (mechanical) of boiler, turbine with their auxiliaries for tpp and unit 9.
Read moreRadiography and ultrasound testing of welding joints in cpp boiler during overhauling-01 unit.
Radiography and ultrasound testing of welding joints in cpp boiler during overhauling-01 unit.
Read moreAppointment of service provider for providing annual maintenance contract for water supply and allied works in seepz sez
Appointment of service provider for providing annual maintenance contract for water supply and allied works in seepz sez
Read moreService contract for overhauling of cw pumps 03 nos and acw pumps 02 nos. during overhauling of unit 5 tentatively in the month of january, 2026 under tmd, stps.
Service contract for overhauling of cw pumps 03 nos and acw pumps 02 nos. during overhauling of unit 5 tentatively in the month of january, 2026 under tmd, stps.
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 25 25 26
Nctps i se mi circle aoh 25 26 bm dn unit i boiler flue gas duct a pass-removal of existing insulation in the flue gas duct during overhaul to facilitate for modular replacement if flue gas duct and relaying the insulation as original after erection
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 25 26 specification no 26 25 26
Nctps i se mi circle aoh 25 26 bm dn unit i boiler flue gas duct b pass removal of existing insulation in the flue gas duct during overhaul to facilitate for modular replacement if flue gas duct and relaying the insulation
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreTtps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler
Read moreof your Industry type