Tender Details

Particulars Details
Title
Service Charges For Conducting Paut (Non Destructive Test) On Welding Joints In Pressure Parts Of Unit 9 Boiler During Unit 9 Annual Overhaul Works.
Description
Service Charges For Conducting Paut (Non Destructive Test) On Welding Joints In Pressure Parts Of Unit 9 Boiler During Unit 9 Annual Overhaul Works.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 165
EMD 6959
Tender Value
Place TS
Link

AAAAAAAAAA

Login to view
Start Date May 02, 2025 01:30
End Date

16/05/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Radiography of old, new weld h.p joints of boiler tube by remote operated gamma radiography camera, processing of films, their interpretation, andg (paut) of weld h.p. joints during capital overhauling of boiler of unit 6

Radiography of old, new weld h.p joints of boiler tube by remote operated gamma&amp#x0d radiography camera, processing of films, their interpretation, andg (paut) of weld&amp#x0d h.p. joints during capital overhauling of boiler of unit 6

Read more
Supervisory service work for boiler pressure parts, safety valves and esp during capital overhauling of unit no. 06 of 2x250mw, ctps, ptpp, parichha jhansi

Supervisory service work for boiler pressure parts, safety valves and esp during capital overhauling of unit no. 06 of 2x250mw, ctps, ptpp, parichha jhansi

Read more
Complete oh of pressure parts of boiler,drum internal, supply of scaffolding, jet cleaning of boiler,main boiler works, soot blower, pant house, repairing works of buck stay,repairing/servicing of hanger support and other works in boiler of u-6

Complete oh of pressure parts of boiler,drum internal, supply of scaffolding, jet cleaning of boiler,main boiler works, soot blower, pant house, repairing works of buck stay,repairing/servicing of hanger support and other works in boiler of u-6

Read more
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Read more
Service charges for conducting paut (non- destructive test) on welding joints in pressure parts of unit-9 boiler during unit-9 annual overhaul works.

Service charges for conducting paut (non- destructive test) on welding joints in pressure parts of unit-9 boiler during unit-9 annual overhaul works.

Read more
Complete overhaul of airpreheaters (2 nos) in unit-ix of ktps v stage during the annual overhaul period

Complete overhaul of airpreheaters 2 nos in unit-ix of ktps v stage during the annual overhaul period

Read more
Dismantling and erection of metalic expansion joints ( 1.rcej 4/5000x3100x561, 2.rcej4/4100x3700x561, 3.rcej1-half size/3874x5574x81mm 4.rcej1/7000x4000x186) along with protection plate and welding of corner piece of expansion joint rcej2-3058x3358x272mm in unit-ix in the annual overhaul period.

Dismantling and erection of metalic expansion joints 1.rcej 4/5000x3100x561 2.rcej 4 4100x3700x561 3.rcej 1-half size 3874x5574x81mm and 4.rcej 1 7000x4000x186 along with protection plate and welding of corner piece of expansion joint rcej 2-3058x3358x272mm in unit-ix in the annual overhaul period.

Read more
Overhauling of louver damper assembly (pad-5ab,5cd 5ef,8a,8b,8c,8d,8e,8f) bypass dampers, pag-7ab,7cd 7ef, gd-5,6,7,8, and repair/erection of expansion joints along with protection plates in pa sa ducts of unit-ix in the annual overhaul of unit-ix

Overhauling of louver damper assembly (pad-5ab 5cd 5ef 8a 8b 8c 8d 8e 8f) bypass dampers pag-7ab 7cd 7ef gd-5 6 7 8 and repair/erection of expansion joints along with protection plates in pa and sa ducts of unit-ix in the annual overhaul of unit-ix

Read more
Overhauling of boiler non-pressure parts (air pre heater and flue/air ducts), unit 4

Overhauling of boiler non-pressure parts (air pre heater and flue/air ducts), unit 4

Read more
Engagement of agency for hiring of 01 (one)no.150mt capacity crawler crane minimum 52 mtr.boom length along with 18 mtr. luffing jib and all other accessories on monthly rental basis in connection with composite works for avu unit, part-a for panipat

Engagement of agency for hiring of 01 (one)no.150mt capacity crawler crane minimum 52 mtr.boom length along with 18 mtr. luffing jib and all other accessories on monthly rental basis in connection with composite works for avu unit, part-a for panipat

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise