Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of C.C Road From Abudla Kaji To Kasam Kaji And Paaru Saddique Peer To Mustri Peer ,Sabbir Gauri And Farookh Kaji To Khalifa Khokhar Ward No 08 Fatehpur Sikar
|
Description |
Construction Of C.C Road From Abudla Kaji To Kasam Kaji And Paaru Saddique Peer To Mustri Peer ,Sabbir Gauri And Farookh Kaji To Khalifa Khokhar Ward No 08 Fatehpur Sikar
|
Organisation | Government of Rajasthan |
Tender Id | 2023_DLB_364006_1 |
Reference Number |
npf/23-24/ 7183-7214 |
Tender Fee | 1000 |
EMD | 22060 |
Tender Value | |
Place | Office City Council Fatehpur |
Link | https://eproc.rajasthan.gov.in |
Start Date | September 08, 2023 23:30 |
End Date |
19/09/2023 ( Expired 646 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreConstruction of surface drain, c.c. road and toe wall etc. at 1 no. s.s. colony near tribeni shibpur foot ball ground, (60 m) and at gafur basti (400 m) in ward no-12.
Construction of surface drain, c.c. road and toe wall etc. at 1 no. s.s. colony near tribeni shibpur foot ball ground, (60 m) and at gafur basti (400 m) in ward no-12.
Read moreProviding, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)
Providing, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)
Read moreConstruction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh
Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh
Read moreof your Industry type