Tender Details

Particulars Details
Title
Cross Pipe Half Round Drain And Cc Road Construction Work At Various Places In Shastri Ward, Sagar Parshad Nidhi
Description
Cross Pipe Half Round Drain And Cc Road Construction Work At Various Places In Shastri Ward, Sagar Parshad Nidhi
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id 2024_UAD_360474_1
Reference
Number
22/24-25/NN/PWD/Sagar/etender
Tender Fee 2295
EMD 8099
Tender Value
Place Municipal Corporation Sagar
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=423961
Start Date July 31, 2024 16:00
End Date

14/08/2024 ( Expired 288 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Const. of cc rd and rcc drain in ward 14 from krishnapuram gate to naresh soni up to lokesh awasthi house

Const. of cc rd and rcc drain in ward 14 from krishnapuram gate to naresh soni up to lokesh awasthi house

Read more
Construction of c.c. road and r.c.c. drain from kallu patel to arvind tiwari in gandhi ward, nagar palika parishad, gotegaon

Construction of c.c. road and r.c.c. drain from kallu patel to arvind tiwari in gandhi ward, nagar palika parishad, gotegaon

Read more
Construction of cc road and drain surendra jain house to vinod sen, khemchand , raka sahele, munna kushwah house at ward 13 sironj

Construction of cc road and drain surendra jain house to vinod sen, khemchand , raka sahele, munna kushwah house at ward 13 sironj

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.

Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.

Read more
Construction of cc road, cc drain, cc chauk in slum wards (ward no. 1, 5 and 15) under ashray shulk nidhi tonkkhurd dewas m.p.

Construction of cc road, cc drain, cc chauk in slum wards (ward no. 1, 5 and 15) under ashray shulk nidhi tonkkhurd dewas m.p.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise