Tender Details
Particulars | Details |
---|---|
Title |
Arunachal Pradesh Civil Sor
|
Description |
Arunachal Pradesh Civil Sor
|
Organisation | Hindustan Petroleum Corporation Limited | Public Sector Undertakings |
Tender Id | 126729 |
Reference Number |
2400014110-HD-09050 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | ARUNACHAL PRADESH |
Link | http://tenders.hpcl.co.in/tenders/tender_prog/Tenders_details.asp?id=126729 |
Start Date | July 05, 2024 15:30 |
End Date |
22/07/2024 ( Expired 322 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreConstruction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreLand slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh
Land slide mitigation including slope stabilization at km 316.880 to km 317.250 near nigulsari and km 330.350 to km 330.560 near nathpa on nh 05 in the state of himachal pradesh
Read moreof your Industry type