Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cleaning Spray Painting Nomenclature And Repairing Of Locks Of J Bs Lie Lir Panels Installed At Boiler And Turbine Side In Unit 3 And 4 Of 2 X210 Mw Ptpp Parichha
|
Description |
Cleaning Spray Painting Nomenclature And Repairing Of Locks Of J Bs Lie Lir Panels Installed At Boiler And Turbine Side In Unit 3 And 4 Of 2 X210 Mw Ptpp Parichha
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2025_RVUNL_1045718_1 |
Reference Number |
T-02/OMC-III/CIMD-I/BTPS/25-26 |
Tender Fee | 590 |
EMD | 4500 |
Tender Value | |
Place | PTPP PARICHHA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1898415 |
Start Date | June 04, 2025 18:30 |
End Date |
27/06/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Read moreService contract for boiler pressure parts checking cleaning repairing for boiler steaming license renewal of unit no1 and efficiency improvement during the schedule short shut down for boiler license renewal of unit no1 at sgtpp
Service contract for boiler pressure parts checking cleaning repairing for boiler steaming license renewal of unit no1 and efficiency improvement during the schedule short shut down for boiler license renewal of unit no1 at sgtpp
Read moreWork services for periodic maint of lt assets including cleaning, replacement of lugs, thimbles cleaning with crc and painting of old panels in tech area and repair / maint of unserviceable / damaged lt switchgear at in-living/basra/mes area at af st
Work services for periodic maint of lt assets including cleaning, replacement of lugs, thimbles cleaning with crc and painting of old panels in tech area and repair / maint of unserviceable / damaged lt switchgear at in-living/basra/mes area at af st
Read moreOverhauling of procon make annunciation system along with contacts cleaning tightening of terminals and reconditioning of panels (associated for alarms and annunciation) in unit no.4 of 2x210mw btps parichha
Overhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of panels (associated for alarms and annunciation) in unit no.4 of 2x210mw btps parichha
Read moreWork contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 4 support columns in unit 4 esp to chimney 3 along west side of trench
Rectification works to the damaged pedestals and providing&#x0d encasing concrete to the structural steel columns along pipe&#x0d rack pr 4 support columns in unit 4 esp to chimney 3&#x0d along west side of trench
Read morePrive repairing and maintenance of one nos. 3.3kv/550v transformer used for feeding power to lt pump motor and 3 nos. 50kva 3.3kv/440v/220v installed at dd mines in respect of bokaro colliery, bnk area
Prive repairing and maintenance of one nos. 3.3kv/550v transformer used for feeding power to lt pump motor and 3 nos. 50kva 3.3kv/440v/220v installed at dd mines in respect of bokaro colliery, bnk area
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreComprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Comprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Read moreProcurement of complete euroflex make connecting flexible couplings and its spares installed in bfp and booster pump, unit no.3 and 4, sgtps, mppgcl, birsinghpur.
Procurement of complete euroflex make connecting flexible couplings and its spares installed in bfp and booster pump, unit no.3 and 4, sgtps, mppgcl, birsinghpur.
Read moreof your Industry type