Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation And Installation Of 1000 Gpm Pump With Motor At 1 Dip/84 L Main Dip Sump Including Transportation, Laying And Joining Of 6 Inch Delivery Pipe Line From 1 Dip/50 L To 1 Dip/84 L And 50 L East District In Seam 1 Combined (Top Seam) At Gayatri
|
| Description |
Transportation And Installation Of 1000 Gpm Pump With Motor At 1 Dip/84 L Main Dip Sump Including Transportation, Laying And Joining Of 6 Inch Delivery Pipe Line From 1 Dip/50 L To 1 Dip/84 L And 50 L East District In Seam 1 Combined (Top Seam) At Gayatri
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_332881_1 |
|
Reference Number |
GM/BSPR/GMO/Srvy/e-tender/ 2024-25/31 dt.18.03.25 |
| Tender Fee | 0 |
| EMD | 6500 |
| Tender Value | - |
| Place | GAYATRI UG MINE BISHRAMPUR AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345074 |
| Start Date | March 20, 2025 15:30 |
| End Date |
Expired
29/03/2025
Expired 564 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Malma cleaning in 1 dip (belt roadway) from 94l/1dip to 122l/1dip for extension of belt at massan combined seam, shiwani ug mine, bhatgaon area
Malma cleaning in 1 dip (belt roadway) from 94l/1dip to 122l/1dip for extension of belt at massan combined seam, shiwani ug mine, bhatgaon area
Read moreTransportation and installation of 1000 gpm pump with motor at 33 l east including transportation , laying and joining of 6 inch delivery pipe line through incline no.1 up to discharge at surface settling tank in seam-1combined top seam at gayatri ug
Transportation and installation of 1000 gpm pump with motor at 33 l east including transportation , laying and joining of 6 inch delivery pipe line through incline no.1 up to discharge at surface settling tank in seam-1combined top seam at gayatri ug
Read moreTransportation and installation of 1000 gpm pump with motor at 18 l(east)/3dip including transportation, laying and joining of 6 inch delivery pipe line through incline no.1 up to discharge at surface (settling tank) in seam-0 at gayatri ug mine
Transportation and installation of 1000 gpm pump with motor at 18 l(east)/3dip including transportation, laying and joining of 6 inch delivery pipe line through incline no.1 up to discharge at surface (settling tank) in seam-0 at gayatri ug mine
Read moreEstablishment of ht pump (1000 gpm, 400 mtr head) in dip side of dishergarh seam of ningah colliery
Establishment of ht pump (1000 gpm, 400 mtr head) in dip side of dishergarh seam of ningah colliery
Read more(i) transportation and installation of 1000 mm wide belt conveyor along 8r,89l,12r,84l,93l, belt dip and 91l for 89l west and 84l west panel of east block (ii) transportation and installation of haulage system, laying and packing of haulage track lin
(i) transportation and installation of 1000 mm wide belt conveyor along 8r,89l,12r,84l,93l, belt dip and 91l for 89l west and 84l west panel of east block (ii) transportation and installation of haulage system, laying and packing of haulage track lin
Read moreRegular cleaning of debris of coal dust / spillage coal / malma below loading point /tail end discharge point and nearby along trunk belt roadway and gate belt/ district belt roadway of seam-1 combined top seam and seam 0(bottom seam) at gayatri ug
Regular cleaning of debris of coal dust / spillage coal / malma below loading point /tail end discharge point and nearby along trunk belt roadway and gate belt/ district belt roadway of seam-1 combined top seam and seam 0(bottom seam) at gayatri ug
Read moreInstallation of winch along with 240mtr track line fitting from 0 dip r-vi seam to 0 dip r-v seam for transportation of material of cm-1 section at ug of mic,jpc
Installation of winch along with 240mtr track line fitting from 0 dip r-vi seam to 0 dip r-v seam for transportation of material of cm-1 section at ug of mic,jpc
Read moreTransportation, laying fitting of 180 m 60lbs track line from d-17 tg and bg/8th dip junction to e-8 tg/6th dip junction of xvi(b) seam, cleaning b blasted stone at 6th dip/ e 8 bg and 6th dip/e/9 tg junction of xvi(b) seam
Transportation, laying
 fitting of 180 m 60lbs 
 track line from d-17 tg 
 and bg/8th dip junction to 
 e-8 tg/6th dip junction of 
 xvi(b) seam, cleaning b 
 blasted stone at 6th dip/ e
 8 bg and 6th dip/e/9 tg 
 junction of xvi(b) seam
Read moreDifferent type jobs such as cleaning fallen stone/debris from 2nd level of 6th dip in xvi(b) seam, transportation of girders , legpost , 4 and 2 ms pipes from 8th dip/500mh mainline jn. to 2ndlevel/6th dip junction of xvi (b) seam at moonidih
Different type jobs such as cleaning fallen stone/debris from 2nd level of 6th dip in xvi(b) seam, transportation of girders , legpost , 4 and 2 ms pipes from 8th dip/500mh mainline jn. to 2ndlevel/6th dip junction of xvi (b) seam at moonidih
Read moreConstruction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area
Construction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area
Read moreof your Industry type