Tender Details
Particulars | Details |
---|---|
Title |
Installation Of Winch Along With 240mtr Track Line Fitting From 0 Dip R Vi Seam To 0 Dip R V Seam For Transportation Of Material Of Cm 1 Section At Ug Of Mic,Jpc
|
Description |
Installation Of Winch Along With 240mtr Track Line Fitting From 0 Dip R Vi Seam To 0 Dip R V Seam For Transportation Of Material Of Cm 1 Section At Ug Of Mic,Jpc
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_310648_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/38 dated 12.06.2024 |
Tender Fee | 0 |
EMD | 5600 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321881 |
Start Date | June 18, 2024 16:30 |
End Date |
28/06/2024 ( Expired 322 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Read moreTransportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Read moreRe organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecl
Re organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecltr
Read moreTransport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Read moreTender for supply of equipment material design erection testing and commissioning for sop to phc bhageigarh by providing 100 kva sub station along with 11 kv ht line in section nakror under esd hpsebl tissa
Tender for supply of equipment material design erection testing and commissioning for sop to phc bhageigarh by providing 100 kva sub station along with 11 kv ht line in section nakror under esd hpsebl tissa
Read moreProvision for laying of water supply pipe line to riti building along with improvement of water supply to roti campus including laying of 250 mm dia rising main from ghatikia mbr to sampur pumping station under watco section, ghatikia, bhubaneswar
Provision for laying of water supply pipe line to riti building along with improvement of water supply to roti campus including laying of 250 mm dia rising main from ghatikia mbr to sampur pumping station under watco section, ghatikia, bhubaneswar
Read moreTransportation of coal from cob#6 to cob#1-5 along with installation of silos (package-2)
Transportation of coal from cob#6 to cob#1-5 along with installation of silos (package-2)
Read moreRemodeling of 200mmdia existing sewer line with 250mmdia swg sewerage pipeline from h.no.6-2-5/b5 to h.no.b-99,b-type quarters,ph-1,vanastalipuram under vanastalipuram section,sd-ii,o and m divn-xi
Remodeling of 200mm dia existing sewer line with 250mm dia swg sewerage pipeline from h.no.6-2-5/b5 to h.no.b-99, b-type quarters, ph-1, vanasthalipuram under vanasthalipuram section, sd-ii, o and m divn-xi.
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreConstruction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l
Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l