Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Of White Town In Puducherry Under The Challenge Based Destination Development Scheme Of Govt Of India. Sub Work Civil Work Components In The Development Of White Town, Puducherry.
|
| Description |
Development Of White Town In Puducherry Under The Challenge Based Destination Development Scheme Of Govt Of India. Sub Work Civil Work Components In The Development Of White Town, Puducherry.
|
| Organisation | Department of Local Administration | State Govt. and UT |
| Tender Id | 2025_DLA_20846_1 |
|
Reference Number |
PM/EE/ e-tender/156 /2025-26 |
| Tender Fee | 1575 |
| EMD | 12.33 Lakh |
| Tender Value | |
| Place | Rajbhavan |
| Link |
View Original Tender Notice
https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=21247 |
| Start Date | December 12, 2025 19:30 |
| End Date |
Expired
02/01/2026
Expired 156 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tharpahar road construction work under the fourth phase of chief minister urban infrastructure development scheme.
Tharpahar road construction work under the fourth phase of chief minister urban infrastructure development scheme.
Read more06/ee(civil)puducherry-i/cpwd/2026-27(r1)
Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, de,olition of existing quarters other development works. (electrical and mechanical installation): package c1: providng internal e1, c2: providing fire alarm system, c3: providing firefighting system, c4: providing 5000 lpd solar water heater , c7: providing networking, (agreement no. 32/ee(puducherry)/cpwd/2023-24) sub head: risk cost under clause 14 for execution of masonry work, finishing work, sanitary installations and fittings, water supply installations and fittings drainage and water proofing work treatment in sunken flooring.
Read moreConstruction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters other development works. (electrical and mechanical installations): package c1: providing internal e1, c2: providing fire alarm system, c3: providing fire fighting system, c4: providing cctv, c5: providing 3 nos 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providng networking, (agrement no. 32/ee(puducherry)/cpwd/2023-24) sub head: risk cost under clause 14 for providing and fixing of fire door.
Read moreWork of carriage of damaged transformers in ipds town and rapdrp under the jurisdiction of edd-shamli.
Work of carriage of damaged transformers in ipds town and rapdrp under the jurisdiction of edd-shamli.
Read moreWork of carriage of damaged transformers in ipds town and rapdrp under the jurisdiction of edd-tbn
Work of carriage of damaged transformers in ipds town and rapdrp under the jurisdiction of edd-tbn
Read moreWork of carriage of damaged transformers in ipds town and rapdrp under the jurisdiction of edd-krn
Work of carriage of damaged transformers in ipds town and rapdrp under the jurisdiction of edd-krn
Read moreAnnual plan-proj no-296/25-26-related works of aranjanithazham ayurvedic sub centre in koothattukulam municipality-general civil work
This estimate is about the related works of&#x0d aranjanithazham ayurvedic sub centre in&#x0d koothattukulam municipality under the annual&#x0d project 2025-2026
Read moreWork of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Work of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Read moreUnder the business plan scheme 2026-27, the work of capacity enhancement/construction of 11/.04 kv substations under the electricity distribution division, muradnagar.
Under the business plan scheme 2026-27, the work of capacity enhancement/construction of 11/.04 kv substations under the electricity distribution division, muradnagar.
Read moreUnder the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Under the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Read moreof your Industry type