Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing New Borewell,Motor With Extension Of Pipe Line To Ss Puram In Koodankulam Village Panchayat In Radhapuram Panchayat Union
|
Description |
Providing New Borewell,Motor With Extension Of Pipe Line To Ss Puram In Koodankulam Village Panchayat In Radhapuram Panchayat Union
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_RDTN_362622_1 |
Reference Number |
A2/2356/2023 |
Tender Fee | 0 |
EMD | 4900 |
Tender Value | |
Place | BLOCK DEVELOPMENT OFFICE,RADHAPURAM |
Link | https://tntenders.gov.in |
Start Date | August 24, 2023 14:30 |
End Date |
29/08/2023 ( Expired 659 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreRemoval of evaporator e221 a and b shell old cladding with patches and to reinstall new cladding already rolled in urea plant during tar 2025
Removal of evaporator e221 a and b shell old cladding with patches and to reinstall new cladding already rolled in urea plant during tar 2025
Read moreProviding gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Providing gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Read moreProviding and laying of 110mm od pp-r pipe line from apwd treatment plant corbyns cove to pbmc sump tank brookshabad, ward no.21 and 22
Providing and laying of 110mm od pp-r pipe line from apwd treatment plant corbyns cove to pbmc sump tank brookshabad, ward no.21 and 22
Read moreProviding and laying of 110mm od, 90mm od and 75mm od pp-r branch pipe from backside of agency house area, backside of bathu basthi area and geeta general store to new colony at garacharma and bathu basthi, ward no. 24
Providing and laying of 110mm od, 90mm od and 75mm od pp-r branch pipe from backside of agency house area, backside of bathu basthi area and geeta general store to new colony at garacharma and bathu basthi, ward no. 24
Read moreof your Industry type