Tender Details

Particulars Details
Title
Mtps I Bm Unit Ii Coh 2024 25 Fg Duct A Side Dismantling Fabrication Supply And Erection Of Portion Of Flue Gas Ducts From Aph Outlet To 45 Degree Slope End
Description
Mtps I Bm Unit Ii Coh 2024 25 Fg Duct A Side Dismantling Fabrication Supply And Erection Of Portion Of Flue Gas Ducts From Aph Outlet To 45 Degree Slope End
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_494926_1
Reference
Number
CE/ MTPS-I / SE / M-I / BM / OT. 234 /2024-25
Tender Fee 0
EMD 78600
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=588043
Start Date October 19, 2024 00:25
End Date

24/10/2024 ( Expired 179 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Bm-bending fabrication erection of the damaged worn-out portion / replacement of guide vanes for flue gas ducts of unit-ix during overhaul of unit -ix.

Bm-bending fabrication and erection of the damaged worn out portion replacement of guide vanes for flue gas ducts of unit ix during overhaul of unit ix.

Read more
Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03

Ttps mech ii bm unit iv v attending breakdown works in id fans aphs structural supports and platforms and clearing of coal powder from airpreheater outlet to esp inlet of flue gas duct path a b c d of unit iv v for the period from 01 04 2025 to 31 03

Read more
Pre fabrication/modification, erection and hooking up of a portion of 1800 mm ms inlet gas ducts between w4 and new iat and 1800mm ms outlet gas duct between new iat and w5 in connection with hook up of new iat in sa plant, fact-cd.

Pre fabrication/modification, erection and hooking up of a portion of 1800 mm ms inlet gas ducts between w4 and new iat and 1800mm ms outlet gas duct between new iat and w5 in connection with hook up of new iat in sa plant, fact-cd.

Read more
Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii

Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii

Read more
Mtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works

Mtps i bm unit ii coh 2024 25 id fan 2a reconditioning of the eroded discharge spiral portion in the id fan top casing renewal of casing wear liner and other related works

Read more
Mtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25

Mtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25

Read more
Mtps i bm unit ii coh 2024 25 replacement of the worn out impeller wear liner plates and other related works in id fan 2a including cost of impeller wear liner plate 1 set

Mtps i bm unit ii coh 2024 25 replacement of the worn out impeller wear liner plates and other related works in id fan 2a including cost of impeller wear liner plate 1 set

Read more
Mtps i bm unit ii boiler pressure parts coh 2024 supply and installation of air sealants in penthouse to avoid ash leakage air ingression to the boiler and allied works

Mtps i bm unit ii boiler pressure parts coh 2024 supply and installation of air sealants in penthouse to avoid ash leakage air ingression to the boiler and allied works

Read more
Mtps i mill plant unit ii cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 2a to 2f during coh 2024 25

Mtps i mill plant unit ii cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 2a to 2f during coh 2024 25