Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Bm Unit Ii Coh 2024 25 Fg Duct A Side Dismantling Fabrication Supply And Erection Of Portion Of Flue Gas Ducts From Aph Outlet To 45 Degree Slope End
|
Description |
Mtps I Bm Unit Ii Coh 2024 25 Fg Duct A Side Dismantling Fabrication Supply And Erection Of Portion Of Flue Gas Ducts From Aph Outlet To 45 Degree Slope End
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_494926_1 |
Reference Number |
CE/ MTPS-I / SE / M-I / BM / OT. 234 /2024-25 |
Tender Fee | 0 |
EMD | 78600 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=588043 |
Start Date | October 19, 2024 00:25 |
End Date |
24/10/2024 ( Expired 247 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, fabrication, supply, erection and commissioning of boiler chimney with flue gas duct for 6 tph boilers at verka sangrur dairy including dismantling of old chimney
Design, fabrication, supply, erection and commissioning of boiler chimney with flue gas duct for 6 tph boilers at verka sangrur dairy including dismantling of old chimney
Read moreMtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Mtps i bm unit i removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom portion of fg duct from mill bay outlet to esp inlet and other related works
Read moreMtps i bm unit i aoh 2025 26 flue gas duct a and b sides patch up works and other repair works between aph out let to esp inlet
Mtps i bm unit i aoh 2025 26 flue gas duct a and b sides patch up works and other repair works between aph out let to esp inlet
Read moreMtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works
Mtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works
Read moreWork contract for duct velocity and (cfd) analysis of flue gas ducts from eco outlet to id fan inlet alongwith design, manufacture supply and erection of diverter plates, application of refractory at boiler of 1x500 mw unit
Work contract for duct velocity and (cfd) analysis of flue gas ducts from eco outlet to id fan inlet alongwith design, manufacture supply and erection of diverter plates, application of refractory at boiler of 1x500 mw unit
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreSupply of iron and steel materials for unit i ii and iii primary air secondary air duct flue gas ducts airpreheaters and esp
Supply of iron and steel materials for unit i ii and iii primary air secondary air duct flue gas ducts airpreheaters and esp
Read moreMtps i bm unit i aoh 2025 26 strengthening of the eroded portions of esp hopper fg duct from esp outlet to chimney and other related works in both a and b sides
Mtps i bm unit i aoh 2025 26 strengthening of the eroded portions of esp hopper fg duct from esp outlet to chimney and other related works in both a and b sides
Read moreKtps-v stage- bm- bending fabrication and erection of the damaged worn-out portion replacement of guide vanes for flue gas ducts of unit9 during overhaul of unit9
Ktps-v stage- bm- bending fabrication and erection of the damaged worn-out portion replacement of guide vanes for flue gas ducts of unit9 during overhaul of unit9-reg
Read moreMtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works
Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works
Read moreof your Industry type