Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Bm Unit Ii Coh 2024 25 Dismantling Fabrication And Erection Of Portion Of Flue Gas Ducts From Economizer Outlet To Aph Inlet Of Both A And B Sides Etc
|
Description |
Mtps I Bm Unit Ii Coh 2024 25 Dismantling Fabrication And Erection Of Portion Of Flue Gas Ducts From Economizer Outlet To Aph Inlet Of Both A And B Sides Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_498545_1 |
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT. 232 / 2024-25 |
Tender Fee | 0 |
EMD | 14000 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=592435 |
Start Date | November 04, 2024 23:10 |
End Date |
10/11/2024 ( Expired 210 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Urgent mtc of bailey bridge under manu sub division pwd r nd b during the year 2025 26 sh supplying fitting nd fixing of different bailey bridge components erection and dismantling of bailey bridge cc work etc gr ii
Supplying fitting nd fixing of different bailey bridge components erection and dismantling of bailey bridge cc work etc
Read moreUrgent mtc of bailey bridge under manu sub division pwd r nd b during the year 2025 26 sh supplying fitting fixing of different bailey bridge components erection and dismantling of bailey bridge cc work etc gr i
Supplying fitting fixing of different bailey bridge components erection and dismantling of bailey bridge cc work etc
Read moreNctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreMtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works