Tender Details

Particulars Details
Title
Construction Plugging The Creek On Left Side Of Bhini River By Way Of 30m Revetment And One No 24mtrr Long Stud Rd 0 600m.
Description
Civil Work
Organisation I and FC | State Govt. and UT
Tender Id 2024_IFC_252344_2
Reference
Number
08 OF 07/2024-25
Tender Fee 2000
EMD 59840
Tender Value -
Place Kathua
Link
View Original Tender Notice

https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=733402

Start Date July 06, 2024 23:30
End Date
Expired 23/07/2024

Expired 816 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of damaged boundary wall for plugging the opening of biharipur drain at rd 30m to rd 600m in district north-east.

Construction of damaged boundary wall for plugging the opening of biharipur drain at rd 30m to rd 600m in district north-east.

Read more
Construction of protection work long left bank of river devak d s nh-44 opposite aiims vijaypur by way of revetment crates and strengthening of embankment

Construction of protection work long left bank of river devak d s nh-44 opposite aiims vijaypur by way of revetment crates and strengthening of embankment

Read more
Raising/ strengthening of embankment and revetment on left bank of river chenab at village sajwal (at spots)

Raising/ strengthening of embankment and revetment on left bank of river chenab at village sajwal (at spots)

Read more
Construction of 12m long stud on r/s on chatta nallah along chowadhi- chatta road at chatta (u/s) with 18m long crate revetment

Construction of 12m long stud on r/s on chatta nallah along chowadhi- chatta road at chatta (u/s) with 18m long crate revetment

Read more
Construction of 1 nos 24m long stud along left side of nikki tawi at lalyal upstream lift irrigation scheme (stud no. 01)

Construction of 1 nos 24m long stud along left side of nikki tawi at lalyal upstream lift irrigation scheme (stud no. 01)

Read more
Construction of flood protection work by way of revetment crates and 01 nos stud at village jassore/ kalali tibba/ gujjar basti and badyal brahmana (at spots) on left side of river nikki tawi.

Construction of flood protection work by way of revetment crates and 01 nos stud at village jassore/ kalali tibba/ gujjar basti and badyal brahmana (at spots) on left side of river nikki tawi.

Read more
Providing protection to eroding left edge or river ravi by series of t-studs to save bop chandigarh downstream existing revetment downstream of spur 9230 of sharan bundh on left side of river ravi

Providing protection to eroding left edge or river ravi by series of t-studs to save bop chandigarh downstream existing revetment downstream of spur 9230 of sharan bundh on left side of river ravi

Read more
Construction of boulder stone revetment on left of ghaggar river bridge in village surat manoli in to pr collapse of piers

Construction of boulder stone revetment on left of ghaggar river bridge in village surat manoli in to pr collapse of piers

Read more
River mitigation by repair, restoration and bringing to design section stud and revetment opposite rd 87000 of main fpe to save launch pad of pantoon brigde on left side of river ravi damaged during floods of 2025 in village kot razada, tehsil ajnala

River mitigation by repair, restoration and bringing to design section stud and revetment opposite rd 87000 of main fpe to save launch pad of pantoon brigde on left side of river ravi damaged during floods of 2025 in village kot razada, tehsil ajnala

Read more
Repair of bank by constructing revetment and earthwork filling on left side of river ghaggar from village tiwana to sadhapur (top layer)

Repair of bank by constructing revetment and earthwork filling on left side of river ghaggar from village tiwana to sadhapur (top layer)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise