Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Construction Material With Poi Driver In Scheme Mnrega, Sfc , Ffc And Other Scheme For Fin Yr 2025 26 In Gram Panchyat Raipur Ps Gangapur City
|
Description |
Supply Of Construction Material With Poi Driver In Scheme Mnrega, Sfc , Ffc And Other Scheme For Fin Yr 2025 26 In Gram Panchyat Raipur Ps Gangapur City&Amp#X0d
|
Organisation | Panchayati Raj Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1500 |
EMD | 1 Lakh |
Tender Value | |
Place | GRAM PANCHYAT RAIPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | May 05, 2025 20:30 |
End Date |
15/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual tender for supply installation, testing and commissioning of different maintenance material for motor control panel of water works for financial year 25-26 in municipal corporation chhindwara
Annual tender for supply installation, testing and commissioning of different maintenance material for motor control panel of water works for financial year 25-26 in municipal corporation chhindwara
Read moreAnnual tender for supply installation, testing rewinding and commissioning of different maintenance material for pump and motor of water works for financial year 25-26 in municipal corporation chhindwara
Annual tender for supply installation, testing rewinding and commissioning of different maintenance material for pump and motor of water works for financial year 25-26 in municipal corporation chhindwara
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreProcurement of raw material items and tools/equipments for use in training centres of kashmir division for the year 2025-26.
Procurement of raw material items and tools/equipments for use in training centres of kashmir division for the year 2025-26.
Read moreSupply of material for ipm including mechanical control prochloraz 34 point 8 percent plus propiconazole 7 point 8 percent ec at different blocks of hooghly district each packet size should be 100ml scheme aromatic rice under rkvy 2025-26
Supply of material for ipm including mechanical control prochloraz 34 point 8 percent plus propiconazole 7 point 8 percent ec at different blocks of hooghly district each packet size should be 100ml scheme aromatic rice under rkvy 2025-26
Read moreDesign, development and upgradation of existing water supply system along with other civil works with one year o andm for panagarg zone ii and wtp for 5.32 mgd capacity panagarh industrial park water supply scheme under dwsd, p.h.e. dte
Design, development and upgradation of existing water supply system along with other civil works with one year o andm for panagarg zone ii and wtp for 5.32 mgd capacity panagarh industrial park water supply scheme under dwsd, p.h.e. dte
Read moreCa no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Ca no. ge af no.1/gur-15/2025-26 repair and maintenance of chlorination system, centrifugal pumping set, yield development, sumersible pumping set, repair of borewell line other connected works for water supply installations at afstation gurgaon un
Read moreTaking tractor-trolly with laborers sel, and driver on rent for transportation of solid waste in npp amla area for financial year 2025-26.
Taking tractor-trolly with laborers sel, and driver on rent for transportation of solid waste in npp amla area for financial year 2025-26.
Read moreSupply and laying in position of construction material like mitti mix gitti dust at different locations at different places of ward 01 to 15 for financial year 2025 municipal council baroda
Supply and laying in position of construction material like mitti mix gitti dust at different locations at different places of ward 01 to 15 for financial year 2025 municipal council baroda
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Read moreof your Industry type