Tender Details
Particulars | Details |
---|---|
Title |
Preparation Of Environmental Impact Assessment (Eia), Environmental Management Plan (Emp) Clearance From Competent Authority And Input For Wildlife Clearance Of Pachnad Irrigation Project On River Yamuna Dist. Auraiya (Up)
|
Description |
Preparation Of Environmental Impact Assessment (Eia), Environmental Management Plan (Emp) Clearance From Competent Authority And Input For Wildlife Clearance Of Pachnad Irrigation Project On River Yamuna Dist. Auraiya (Up)
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDC_843290_1 |
Reference Number |
04/S.E./2023-24 |
Tender Fee | 2714 |
EMD | 2.4 Lakh |
Tender Value | |
Place | Etawah |
Link | https://etender.up.nic.in |
Start Date | September 26, 2023 16:30 |
End Date |
11/10/2023 ( Expired 560 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for consultancy services for conducting environmental and social impact assessment (esia) and preparation of environmental and social management documents (west meghalaya) for meghalaya economic growth accelerator (mega) corridor
Rfp for consultancy services for conducting environmental and social impact assessment (esia) and preparation of environmental and social management documents (west meghalaya) for meghalaya economic growth accelerator (mega) corridor
Read moreRfp for consultancy services for conducting environmental and social impact assessment (esia) and preparation of environmental and social management documents (east meghalaya) for meghalaya economic growth accelerator (mega) corridor
Rfp for consultancy services for conducting environmental and social impact assessment (esia) and preparation of environmental and social management documents (east meghalaya) for meghalaya economic growth accelerator (mega) corridor
Read moreConsultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25
Consultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreAppointment of consultant for environmental impact assessment obtaining forest and crz clearance for proposed metro line 14 from kanjurmarg to badlapur
Appointment of consultant for environmental impact assessment obtaining forest and crz clearance for proposed metro line 14 from kanjurmarg to badlapur
Read morePreparation of detail construction plan survey, design estimation for pipe distribution network system for village sangulwadi, kumbhari and ringewadi of aruna irrigation project tal vaibhavwadi dist sindhudurg
Preparation of detail construction plan survey, design estimation for pipe distribution network system for village sangulwadi, kumbhari and ringewadi of aruna irrigation project tal vaibhavwadi dist sindhudurg
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read morePreparation of safety report crisis management plan and disaster management plan updation of on site emergency plan off site emergency plan and its validationapproval from directorate of industrial health and safety govt of mp indore in respect sgtps
Preparation of safety report crisis management plan and disaster management plan updation of on site emergency plan off site emergency plan and its validationapproval from directorate of industrial health and safety govt of mp indore in respect sgtps
Read moreOn turnkey basis under bina complex irrigation and multipurpose project construction of dehra dam on dehra nallah, semraghat di weir on dhasan river, 4 mw dehra power house and feeder channel for di from dhasan river to dehra dam
On turnkey basis under bina complex irrigation and multipurpose project construction of dehra dam on dehra nallah, semraghat di weir on dhasan river, 4 mw dehra power house and feeder channel for di from dhasan river to dehra dam
Read morePreparation of emergency action plan (eap), dam break analysis, computation of hfl, marking of red line and blue line and hydraulic study of wardha river with detailed block contour survey from downstream of upper wardha project tq. morshi dist. amra
Preparation of emergency action plan (eap), dam break analysis, computation of hfl, marking of red line and blue line and hydraulic study of wardha river with detailed block contour survey from downstream of upper wardha project tq. morshi dist. amra
Read moreof your Industry type