Tender Details

Particulars Details
Title
In Situ Balancing Of Fans At Kachirayapalayam Offsite.
Description
In Situ Balancing Of Fans At Kachirayapalayam Offsite.
Organisation Tamilnadu Newsprint and Papers Limited | State Govt. and UT
Tender Id 2025_TNPL_567914_1
Reference
Number
TNPL/TOS/U1/252613001847
Tender Fee 0
EMD 0
Tender Value -
Place TOS, Kagithapuram
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=678073

Start Date June 13, 2025 00:25
End Date
Expired 20/06/2025

Expired 479 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Terminal blocks and cooling fans

Terminal blocks and cooling fans

Read more
In-situ repair of icpr gtg caca cooler heat exchanger at ic platform

In-situ repair of icpr gtg caca cooler heat exchanger at ic platform

Read more
Procurement of led torches and fans

Procurement of led torches and fans

Read more
Supply of exhaust fans for ups panel for use in stage-i and ii/i and c division

Supply of exhaust fans for ups panel for use in stage-i and ii/i and c division

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Providing window mesh, roof repairs, painting, electrification (fans and tube lights) and compound wall required at tgtwurjc (b) kataram (v) of kataram (m) in jayashankar bhupalapally district

Providing window mesh, roof repairs, painting, electrification (fans and tube lights) and compound wall required at tgtwurjc (b) kataram (v) of kataram (m) in jayashankar bhupalapally district

Read more
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.

Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Providing electrical wiring, flooring repairs, ceilling repairs, water facilities and taps in kitchen, white washing/ painting, tube lights, fans, doors, windows, mesh to windows etc., to tgwurjc (b) utnoor (v) of utnoor (m) of adilabad district ( reserved for sc community as per go 59, dt:21.05.2018)

Providing electrical wiring, flooring repairs, ceilling repairs, water facilities and taps in kitchen, white washing/ painting, tube lights, fans, doors, windows, mesh to windows etc., to tgwurjc (b) utnoor (v) of utnoor (m) of adilabad district ( reserved for sc community as per go 59, dt:21.05.2018)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise