Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Installation Testing And Commissioning For Lt Extension Of 1 Phase At Various Villages Of Turtuk Block Of Nubra Section On Full Turnkey Basis Under District Capex 2024 25.
|
| Description |
Same As Above
|
| Organisation | Power Development and Non-Renewable Energy | State Govt. and UT |
| Tender Id | 2024_PDNRE_14267_1 |
|
Reference Number |
e-NIT No. 74 of ED Leh of 2024-25 dated 24-09-2024 |
| Tender Fee | 1000 |
| EMD | 84000 |
| Tender Value | |
| Place | Leh |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=35518 |
| Start Date | September 25, 2024 15:30 |
| End Date |
Expired
01/10/2024
Expired 612 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, installation, testing and commissioning of a three phase decanter centrifuge system for a 20 tph fresh fruit bunch (ffb) at palm oil mill, yeroor on turnkey basis
Design, supply, installation, testing and commissioning of a three phase decanter centrifuge system for a 20 tph fresh fruit bunch (ffb) at palm oil mill, yeroor on turnkey basis
Read moreSelection of agency for supply, installation, testing and commissioning of 60tpd coconut disposal waste processing plant on ppp basis at devguradiya, indore (madhya pradesh) for 07 years
Selection of agency for supply, installation, testing and commissioning of 60tpd coconut disposal waste processing plant on ppp basis at devguradiya, indore (madhya pradesh) for 07 years
Read moreE-tender for supply, installation, testing and commissioning of high-pressure homogenizer at centre for advanced bio process equipment facility at ticel phase-iii coimbatore
Supply, installation, testing and commissioning of high-pressure homogenizer at centre for advanced bio process equipment facility
Read moreWorks contract for supply, installation, testing and commissioning of 256 ton capacity vrf/vrv chilled air system in documentation center for kknpp-1 to 6.
Works contract for supply, installation, testing and commissioning of 256 ton capacity vrf/vrv chilled air system in documentation center for kknpp-1 to 6.
Read moreSelection of firm/company for supply, installation, testing and commissioning of mrf (material recovery facility) machines at various mrf centers within lucknow municipal corporation area as per specifications.
Selection of firm/company for supply, installation, testing and commissioning of mrf (material recovery facility) machines at various mrf centers within lucknow municipal corporation area as per specifications.
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years
Survey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years at krushibeej farmer producer company ltt
Read moreDesign, engineering, testing, commissioning, erection, supply and installation of 1 no. 132 kv double ckt. d plus 6 type tower in chatha canal section line out to facilitate power flow in second ckt of 132 kv double ckt. miran sahib canal
Design, engineering, testing, commissioning, erection, supply and installation of 1 no. 132 kv double ckt. d plus 6 type tower in chatha canal section line out to facilitate power flow in second ckt of 132 kv double ckt. miran sahib canal
Read moreSupply, installation, testing and comm.of 500kva silent dg and const.of 500kva dg shed at 7.5 mld intake well jokadia and 380kva silent dg and foundation of 400kva dg shed 9.5 mld wtp at mundamala under watco section-1, vyasanagar
Supply, installation, testing and comm.of 500kva silent dg and const.of 500kva dg shed at 7.5 mld intake well jokadia and 380kva silent dg and foundation of 400kva dg shed 9.5 mld wtp at mundamala under watco section-1, vyasanagar
Read moreWork for installation of 11kv rmu and other line work against business plan 2026-27 for quality power supply in aligarh city on semi turn-key basis under the area eudc, aligarh
Work for installation of 11kv rmu and other line work against business plan 2026-27 for quality power supply in aligarh city on semi turn-key basis under the area eudc, aligarh
Read moreof your Industry type