Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🚂 Invitation For Bids: Railway Via Duct Construction 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Construction Of A Railway Via Duct Between Km 941.80 To 942.80, Span 27 X30.5 M, And Major Bridge No 96 (1 X12.2m1 X18.30) Between Km 955.7 To 956.7, As Part Of The Doubling Project Between Brnd To Sjq Section In Bilaspur Division Of The South East Central Railway. 📅 Bid Submission Deadline: July 03, 2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 10,00,000 Interested Contractors Must Review The Complete Tender Documents For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Construction, Railway Via Duct, Bridge Construction, Doubling Project, South East Central Railway, Ministry Of Railways, Government Tender, Infrastructure DevelopmentParticulars | Details |
---|---|
Title |
Construction Of Railway Via Duct Between Km 941.80 To 942.80 Span 27 X30.5 M ( Udalkachar Nagpur Road ) And Major Br No 96 (1 X12.2m1 X18.30) Between Km 955.7 To 956.7 ( Darritola Nagar) &Amp Miscellaneous Work In Connection With Construction Of Doubling Between Brnd To Sjq Section In Bilaspur Division Of South East Central Railway.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74075084 |
Reference Number |
CEC-BSP-24-25-04 |
Tender Fee | 0 |
EMD | 1 Crore |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/74075084/viewNitPdf_4506766.pdf |
Start Date | June 01, 2024 19:25 |
End Date |
03/07/2024 ( Expired 353 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreConstruction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh
Construction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh
Read moreConstr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Constr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConstruction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of 42a0 m single span steel bridge over bhakhra main line at rd 510690 feet on lr mandvi to maha singh wala upto guru teg bahadur marg via ramgarh gujjran, bhamniwala at km 4/980 under package no. pb 17-316a block andana distt. sangrur
Construction of 42a0 m single span steel bridge over bhakhra main line at rd 510690 feet on lr mandvi to maha singh wala upto guru teg bahadur marg via ramgarh gujjran, bhamniwala at km 4/980 under package no. pb 17-316a block andana distt. sangrur
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreProposed construction of drain,culvert and formation of road at chandran garden annex east cross street-3 south cross street-1 (opposite to tambros illam) in division no - 8 of hasthampatty ward office
Proposed construction of drain,culvert and formation of road at chandran garden annex east cross street-3 south cross street-1 (opposite to tambros illam) in division no - 8 of hasthampatty ward office
Read moreof your Industry type