Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation Of 65 M Old Tunnel In Rudraprayag Ch. 0 530 To 0.600 Of Nh 109 (New Nh 107) In The State Of Uttarakhand Under Epc Mode In The State Of Uttarakhand
|
| Description |
Rehabilitation Of 65 M Old Tunnel In Rudraprayag Ch. 0 530 To 0.600 Of Nh 109 (New Nh 107) In The State Of Uttarakhand Under Epc Mode In The State Of Uttarakhand
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_759010_1 |
|
Reference Number |
2790/13yata-NH-10/2023 dated 20.06.2023 |
| Tender Fee | 11800 |
| EMD | 8.42 Lakh |
| Tender Value | - |
| Place | SE(NH) PWD Dehradun |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 10, 2023 17:30 |
| End Date |
Expired
24/07/2023
Expired 1177 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Short term maintenance contract (stmc) work for the stretch of nh-87 (new nh-109) in km. 90 to 106 and km 116 to 120 in the state of uttarakhand
Short term maintenance contract (stmc) work for the stretch of nh-87 (new nh-109) in km. 90 to 106 and km 116 to 120 in the state of uttarakhand
Read moreTreatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreConstruction of viaducts at 12 locations cut and cover tunnel at 02 locations and pedestrian underpass (pup) at 01 location from km 517.250 to km 547.080 section of new nh-66 (old nh-47) in the state of kerala on epc mode
Construction of viaducts at 12 locations cut and cover tunnel at 02 locations and pedestrian underpass (pup) at 01 location from km 517.250 to km 547.080 section of new nh-66 (old nh-47) in the state of kerala on epc mode
Read moreConsultancy services for preparation of detailed project report dpr for rehabilitation of tambakhani tunnel of length 358.50 m at km 97.327 on nh-34 (rishikesh-dharasu-uttarkashi road) in the state of uttarakhand.
Consultancy services for preparation of detailed project report dpr for rehabilitation of tambakhani tunnel of length 358.50 m at km 97.327 on nh-34 (rishikesh-dharasu-uttarkashi road) in the state of uttarakhand.
Read more8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
Read moreRehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreConsultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreof your Industry type