Tender Details

Particulars Details
Title
Laptop,Backlit Magic Keyboard With Touch Pad,Usb C To Lightning Cable,14 Inches,Warranty
Description
Organisation Department of Biotechnology (DBT) | Ministry of Science and Technology
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date April 30, 2025 19:57
End Date

21/05/2025 ( 16 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Imac-24inch purple, mac book pro-14-inch space black, usb-c to usb adapter, apple airpods pro

Imac-24inch purple, mac book pro-14-inch space black, usb-c to usb adapter, apple airpods pro

Read more
Tender for shifting of 22 kv ht line from 250 kva 22/0.4kv lwss behna to bolhidhar dtr with 22kv ht cable 95mm2 (22kv, xlpe, 3c al, armoured ) in electrical section ashla under esd chhatri from vicinity of 220kv d/c single zebra transmission line fr

Tender for shifting of 22 kv ht line from 250 kva 22/0.4kv lwss behna to bolhidhar dtr with 22kv ht cable 95mm2 (22kv, xlpe, 3c al, armoured ) in electrical section ashla under esd chhatri from vicinity of 220kv d/c single zebra transmission line fr

Read more
The work for construction of 33 kv u/g indepandent feeder from 132 kv s/s ledhupur to tibbatan sansthan, sarnath with d/c 3x300 sqmm xlpe cable in the area of uedd- sarnath, varanasi under ee, uecd-ii, varanasi in deposit scheme on semi turn key basi

The work for construction of 33 kv u/g indepandent feeder from 132 kv s/s ledhupur to tibbatan sansthan, sarnath with d/c 3x300 sqmm xlpe cable in the area of uedd- sarnath, varanasi under ee, uecd-ii, varanasi in deposit scheme on semi turn key basi

Read more
Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l

Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l

Read more
Replacement of existing 3 runs of 1 c 1000 sqmm xlpe al power cable from electrical substation to ht incomers with double of 3 c 400 sqmm xlpe al cable.

Replacement of existing 3 runs of 1 c 1000 sqmm xlpe al power cable from electrical substation to ht incomers with double of 3 c 400 sqmm xlpe al cable.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise