Tender Details
Particulars | Details |
---|---|
Title |
Providing Labour On Right Bank Of Tapi River And On Hrbc For Irrigation And Non Irrigation Management Work Under Irrigation Section Yawal 2 For Period Of November 2024 To March 2025 Removing Silt And Grass From Inner Side Of Canal And Repairing Of S
|
Description |
Providing Labour On Right Bank Of Tapi River And On Hrbc For Irrigation And Non Irrigation Management Work Under Irrigation Section Yawal 2 For Period Of November 2024 To March 2025 Removing Silt And Grass From Inner Side Of Canal And Repairing Of S
|
Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
Tender Id | 2024_TIDC_1128526_1 |
Reference Number |
E Tender No 12/05 |
Tender Fee | 2860 |
EMD | 26000 |
Tender Value | |
Place | Yawal |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1968179 |
Start Date | December 24, 2024 15:40 |
End Date |
31/12/2024 ( Expired 111 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
M/r on right bank of river brahmani by palliative protection with bullah and cement poly bag near at village panita at mouza- panita, in block- nalhati-l, dist.- birbhum under m.n.c. division during 2025-26.
M/r on right bank of river brahmani by palliative protection with bullah and cement poly bag near at village panita at mouza- panita, in block- nalhati-l, dist.- birbhum under m.n.c. division during 2025-26.
Read moreGeneral side protection work on the right bank of manimala river and its adjacent tributary near kunnathupuzha in chirakkadavu panchayath side protection and steel bridge construction general civil work
General side protection work on the right bank of manimala river and its adjacent tributary near kunnathupuzha in chirakkadavu panchayath side protection and steel bridge construction general civil work
Read moreA) repairing and overhauling of 6up3 pump of unit no. 756 of industrial pump house, (b) repairing of dsm-3 pump at water in hydro cyclone section, (c) repairing of delta pump of unit no. 1 at river side and d) repairing of 04 nos. non v
A) repairing and overhauling of 6up3 pump of unit no. 756 of industrial pump house, (b) repairing of dsm-3 pump at water in hydro cyclone section, (c) repairing of delta pump of unit no. 1 at river side and d) repairing of 04 nos. non v
Read moreFlood protection work of residential and non-residential buildings on the right bank of bhagirathi river in down stream of steel girder bridge at shri gangotri dham under bhatwadi block distt-uttarkashi (reach- 0.00 to 55.00 mtr)
Flood protection work of residential&#x0d and non-residential buildings on the&#x0d right bank of bhagirathi river in&#x0d down stream of steel girder bridge&#x0d at shri gangotri dham under&#x0d bhatwadi block distt-uttarkashi&#x0d (reach- 0.00 to 55.00 mtr)
Read morePreliminary surveying, designing to give irrigation facilities for village nandikheda, khatkheda and gudegaon on right bank main canal of gosikhurd project.
Preliminary surveying, designing to give irrigation facilities for village nandikheda, khatkheda and gudegaon on right bank main canal of gosikhurd project.
Read moreRemoving eroded soil and construction of gabion wall to protect ip side erosion at ch 00/025 to 0/095 and repairing of aqueduct at ch. 05/705 on surya left bank canal.
Removing eroded soil and construction of gabion wall to protect ip side erosion at ch 00/025 to 0/095 and repairing of aqueduct at ch. 05/705 on surya left bank canal.
Read more02/6a/nit dt.31-01-2025, estimate for providing 290 meter revetment u/s b op shahpur forward for the safety of rmb,c-land and bop shahpur on right side of river ravi (41.148) meter revetment.
Estimate for providing 290 meter revetment u/s b op shahpur forward for the safety of rmb,c-land and bop shahpur on right side of river ravi (41.148) meter revetment.
Read moreM/r to regulator gate and structure including canal banks in connection with boro irrigation 2025 from ch.0.00 to ch.565.00 of mdbc under branch canals section of md.bazar (i) sub-division under mncdivision during the period feb 2025 to april 2025
M/r to regulator gate and structure including canal banks in connection with boro irrigation 2025 from ch.0.00 to ch.565.00 of mdbc under branch canals section of md.bazar (i) sub-division under mncdivision during the period feb 2025 to april 2025
Read moreKrishna koyna lift irrigation scheme - irrigation management of khanderajuri branch canal during rotation and non rotation period for the year 2024-25
Krishna koyna lift irrigation scheme - irrigation management of khanderajuri branch canal during rotation and non rotation period for the year 2024-25
Read moreKrishna koyna lift irrigation scheme - irrigation management and maintainance of lingnoor branch canal km. 1 to 15 during rotation and non rotation period for the yea
Krishna koyna lift irrigation scheme - irrigation management and maintainance of lingnoor branch canal km. 1 to 15 during rotation and non rotation period for the yea
Read moreof your Industry type