Tender Details
Particulars | Details |
---|---|
Title |
Supply Of 50 Mm Size Machine Crushed Stone Pakur Ballast For Ctr(p) 46.68 Km In New Bongaigaon Goalpara Town Kamakhya Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72853375 |
Reference Number |
89-ENGG-RNY-2023-24 |
Tender Fee | 0 |
EMD | 10.14 Lakh |
Tender Value | |
Place | Guwahati |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72853375/viewNitPdf_4440237.pdf |
Start Date | December 30, 2023 00:38 |
End Date |
23/01/2024 ( Expired 480 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and stacking of stone metal of size 45 mm, stone metal of size 40 mm, stone chips 20 mm, stone chips 10 mm, sand bricks and ilcb for rennovation/improvement of pol shed and car parking at hq adgbr(e) complex at jalukbari, guwahati (assam)
Supply and stacking of stone metal of size 45 mm, stone metal of size 40 mm, stone chips 20 mm, stone chips 10 mm, sand bricks and ilcb for rennovation/improvement of pol shed and car parking at hq adgbr(e) complex at jalukbari, guwahati (assam)
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read moreExecution of contract for extension of supply workscapital improvement dcw works in respect of town vickramasingapuram section kallidaikurichi sub division kallidaikurichi division tirunelveli edc
Execution of contract for extension of supply workscapital improvement dcw works in respect of town vickramasingapuram section kallidaikurichi sub division kallidaikurichi division tirunelveli edc
Read moreExecution of contract for extension of supply workscapital improvement dcw works in respect of town ambasamudram section ambasamudram sub division kallidaikurichi division tirunelveli edc
Execution of contract for extension of supply workscapital improvement dcw works in respect of town ambasamudram section ambasamudram sub division kallidaikurichi division tirunelveli edc
Read moreSupply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Supply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Read moreof your Industry type