Title
Repairing, Strengthening Of Tail End Drum Base Structure Of Conveyor No. 1602 Of Ps 9 Section And Dismantling Of Damaged Deck Plates, Idler Frame With Rollers, Rollers, Fabrication And Erection Of Same Of Unit No. 1602 Tail End Side
Description
Repairing, Strengthening Of Tail End Drum Base Structure Of Conveyor No. 1602 Of Ps 9 Section And Dismantling Of Damaged Deck Plates, Idler Frame With Rollers, Rollers, Fabrication And Erection Of Same Of Unit No. 1602 Tail End Side
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_311398_1
Reference
Number
BCCL/PO/MCW/E-TENDER/ 2023-24/005
Tender Fee 0
EMD 3034
Tender Value
Place MADHUBAN COAL WASHERY
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322704
Start Date June 28, 2024 14:30
End Date

06/07/2024 ( Expired 290 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling , fabrication and erection of base structure of pump and motor for domestic water supply, quarry no. 03 and quarry no. 06 at religara project under argada area

Dismantling , fabrication and erection of base structure of pump and motor for domestic water supply, quarry no. 03 and quarry no. 06 at religara project under argada area

Read more
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .

Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .

Read more
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Read more
Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp

Repairing of 02 nos tail end drum of c3 and c7 belt and 01 no discharge drum of c8 belt conveyor of bhatgaon chp

Read more
Repairing and strengthening of rom classification screen ns-1 including its side plates, beams and base structure at moonidih coal washery.

Repairing and strengthening of rom classification screen ns-1 including its side plates, beams and base structure at moonidih coal washery.

Read more
Fabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery

Fabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery

Read more
Repair and dismantling of old motor and base, fabrication and erection of new motor and base fitting and assembly etc. of unit. no. 929 and 931 in rlb section of kathara washery

Repair and dismantling of old motor and base, fabrication and erection of new motor and base fitting and assembly etc. of unit. no. 929 and 931 in rlb section of kathara washery

Read more
Fabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery

Fabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery

Read more
Dismantling, fabrication/erection of vibro feeder structure, chutes gate etc. 01 no., 02 no. road side and 03, 05 no. store side in main plant plant of sawang washery.

Dismantling, fabrication/erection of vibro feeder structure, chutes gate etc. 01 no., 02 no. road side and 03, 05 no. store side in main plant plant of sawang washery.

Read more
Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec

Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec