Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Preparation Of Detailed Project Report For 4/6 Lanes /4/6 Lane With Paved Shoulder Configuration For The Stretch Of Gwalior Bhind Upto Mp/Up Border (Nh 92), Total Length 108 Km In The State Of Madhya Pradesh
|
| Description |
Consultancy Services For Preparation Of Detailed Project Report For 4/6 Lanes /4/6 Lane With Paved Shoulder Configuration For The Stretch Of Gwalior Bhind Upto Mp/Up Border (Nh 92), Total Length 108 Km In The State Of Madhya Pradesh
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_775356_1 |
|
Reference Number |
CE-RO/BPL/DPR-3/2023-24 |
| Tender Fee | 5000 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | Nirman Bhawan Arera Hills Bhopal |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | October 10, 2023 00:00 |
| End Date |
Expired
20/11/2023
Expired 1058 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreDevelopment of the descoped 530 m stretch of nh325 from km. 72.065 to 72.595 to two lane with paved shoulders configuration in state of rajasthan.
Development of the descoped 530 m stretch of nh325 from km. 72.065 to 72.595 to two lane with paved shoulders configuration in state of rajasthan.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreof your Industry type