Particulars | Details |
---|---|
Title |
Loading, Unloading, Dismantling, Cutting, Welding And Laying Of 8 Inch Dia G.I. Pipeline Required For Extension Of The Existing Delivery Pipeline Of The 2000 G.P.M. Pump Motor Set, Installed At Patch A To Supply Water To The Reservoir Tank
|
Description |
Loading, Unloading, Dismantling, Cutting, Welding And Laying Of 8 Inch Dia G.I. Pipeline Required For Extension Of The Existing Delivery Pipeline Of The 2000 G.P.M. Pump Motor Set, Installed At Patch A To Supply Water To The Reservoir Tank
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_295094_1 |
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 23-24/ 36 |
Tender Fee | |
EMD | 1200 |
Tender Value | |
Place | Office of the P.O. (Karo OCP), |
Link | https://coalindiatenders.nic.in |
Start Date | December 03, 2023 16:30 |
End Date |
13/12/2023 ( Expired 557 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9
Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9
Read moreDi of pipeline 300 mtrs length, dia 6 inch (dismantling, transporting ,laying, jointing)at nichitpur ocp(ii) and installation of ms pipe 100mm 4 inch digging laying, jointing, refilling, welding etc
Di of pipeline 300 mtrs length, dia 6 inch (dismantling, transporting ,laying, jointing)at nichitpur ocp(ii) and installation of ms pipe 100mm 4 inch digging laying, jointing, refilling, welding etc
Read moreLaying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Read moreWork of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine
Read moreDismantling, handling, loading and unloading of 6inch dia (about 4100 mtr) and 8inch dia (2000 mtr) m.s. pipeline under s. b. project.
Dismantling, handling, loading and unloading of 6inch dia (about 4100 mtr) and 8inch dia (2000 mtr) m.s. pipeline under s. b. project.
Read moreDismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreDismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Dismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Read moreTransportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Transportation and installation of 1000 gpm pump with motor at 124l/8d to132l/02d including laying and fitting of 6 inch diameter pipe line from 132l/02d to 123l/7d and connecting with existing pipe line for borehole at 110l.laying and installation
Read moreof your Industry type