Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Wsm 2023 24 Wsm 2023 24 Annual Maintenance Of Lbmc Vazhani Canal From Ch 0 000 Km To 16 000 Km And Clearing Amp Removing Obstructions During Summer Water Distribution General Civil Work
|
| Description |
Clearing Grass Twice On
Both Canal Side Before Mundakan Crop Distribution Summer Water Distribution Silt Removal From Unlined Bottom And Concreted Bed
Bottom With Suitable Thickness Proposed To
Necessary Lengths Of Canal Engaging Man
Mazdoor
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_596324_1 |
|
Reference Number |
IRR/IA/TR/2222/2023_5_27_25/1 |
| Tender Fee | 2760 |
| EMD | 25421 |
| Tender Value | - |
| Place | AEE irrigation subdivision Thalappilly |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | August 17, 2023 20:30 |
| End Date |
Expired
23/08/2023
Expired 1150 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance of clearing and removing siltfrom the mundopilly branch canal from ch 0650 to 1200 km and vengoor branch canal fromch5050 to 6100 km and clearing removing floating materials during water distribution inkalady main canal from ch 000
Annualmaintenance and water distribution
Read moreGeneral karavaloor kip canal road work rectification lbmc bund road work between ch 14900m to 15600m general civil work
General karavaloor kip canal road work rectification lbmc bund road work between ch 14900m to 15600m general civil work
Read moreDeposit wp district panchayath 2026 27 - phase ii - clearing and removing jungle grass, silt and other obstructions from cada field channels of various canals under walayar dam section- general civil work
Clearing grass surface dressing earthwork excavation
Read more2026-27-annual maintenance -aluva branch canal between ch. 0 km to 4.0 km, mudikkal sbc ch. 0 to 7.5km, pallipram md ch. 0 to 1 km, malayampurathupady md ch. 0 to 0.585km, including pre water distribution cleaning, clearing syphon/well d
Annual maintenance -aluva branch canal between ch. 0 km to 4.0 km
Read moreGeneral iip crds 2025 26 rectification works to kanjirapilly branch canal between ch.0 000 km and 0 250 km -general civil work
General iip crds 2025 26 rectification works to kanjirapilly branch canal between ch.0 000 km and 0 250 km -general civil work
Read moreGeneral-psm 2026-27-annual maintenance of kozhukkully branch canal from ch.0/000 to 6/700km for the year 2026-27-general civil work
General-psm 2026-27-annual maintenance of kozhukkully branch canal from ch.0/000 to 6/700km for the year 2026-27-general civil work
Read moreGps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Gps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Read moreGeneral cpp tms 2026 27 modernization of field channel offtaking from sluice no 39 of nallepilly branch canal bw ch 0 000 km to 0 500 general civil work
Modernization of field channel offtaking from sluice no 39 of nallepilly branch canal bw ch 0 000 km to 0 500
Read moreGeneral-mp-es-annual maintenance 2026- 27-silt removal,jungle clearance for chulannur canal between ch 12/850 km to 24/000 km and its sub canals -general civil work
Engaging man mazdoor, engaging hydraulic excavator for canal cleaing
Read moreGeneral-mp-es-annual maintenance 2026- 27-silt removal jungle clearance for chulannur branch canal between ch 0/000 km to 6/400 km and its sub canals-general civil work
Engaging man mazdoor ,engaging hydraulic excavator for canal cleaning
Read moreof your Industry type