Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Action Plan 2024 2025 Wsm 2024 25 Annual Maintenance Of Lbmc Vazhani Canal From Ch 16.000 To 27.000 Km And Clearing And Removing Obstructions Of Lbmc 16.000 To 27.000 Km During Water Distribution For The Year 2024 25 General C
|
| Description |
Clearing Jungle Clearing&Amp#X0d
Grass Silt Removal Mundagan And Summer&Amp#X0d
Man Mazdoor And Tipper For&Amp#X0d
Clearing Obstructions During Water Distribution And For Transporting These Material
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_684791_1 |
|
Reference Number |
IRR/IA/TR/1245/2024_5_4_3/1 |
| Tender Fee | 2760 |
| EMD | 31249 |
| Tender Value | - |
| Place | mundathicode velur |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1065593 |
| Start Date | August 08, 2024 22:30 |
| End Date |
Expired
14/08/2024
Expired 789 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General wsm 2023 24 wsm 2023 24 annual maintenance of lbmc vazhani canal from ch 0 000 km to 16 000 km and clearing amp removing obstructions during summer water distribution general civil work
Clearing grass twice on both canal side before mundakan crop distribution summer water distribution silt removal from unlined bottom and concreted bed bottom with suitable thickness proposed to necessary lengths of canal engaging man mazdoor
Read moreGeneral wsm 2024 25 wsm annual maintenance of lbmc vazhani canal from ch 12/000 km to 16/000 km and clearing and removing obstructions during summer water distribution for the year 2024 25-general civil work
Clearing grass twice on both canal side before mundakan crop and summer water&#x0d distribution silt removal from unlined bottom&#x0d and concreted bed bottom with suitable thickness&#x0d proposed to necessary lengths of canal engaging&#x0d man mazdoor
Read moreGeneral-action plan 2024-2025-wsm 2024-25 annual maintenance of lbmc vazhani canal from ch 27/000 to 39/200 km and clearing and removing obstructions of lbmc 27/000 to 39/200 km during water distribution for the year 2024-25-general c
Clearing jungle, clearing&#x0d grass, silt removal before the commencement of&#x0d water distribution during mundagan and summer man mazdoor and tipper for&#x0d clearing obstructiongreese and lock for shutters and&#x0d patch work
Read moreGeneral action plan 2023 2024 wsm 2023 24 annual maintenance of lbmc vazhani canal from ch 27 000 km to 39 200 km amp clearing and removing obstructions of lbmc 27 000 to 39 200 km during water distribution for the year 2023 24 general civil work
Clearing grass silt removal before the commencement of water distribution during mundagan and summer necessary internals man mazdoor and tipper for clearing obstructions during water distribution and for transporting debis and other materials
Read moreGeneral action plan 2023 2024 wsm 2023 24 annual maintenance of lbmc vazhani canal from ch 16 000 km to 27 000 km amp clearing and removing obstructions of lbmc 16 000 to 27 000 km during water distribution for the year 2023 24 general civil work
Clearing grass silt removal bfore the commencement of water distribution during mundagan and summer necessary internal man mazdoor and tipper for clearing obstructions during water distribution and for transporting these materials
Read moreGeneral-wsm 2024-25-wsm-urgent side protection of right bund of lbmc near ch 10/200 km of vazhani irrigation project
Earthwork&#x0d excavation c c 1 4 8 for foundation c c 1 3 6&#x0d for side wall along with plastering clearing grass on&#x0d both canal sides engaging man mazdoor for clearing obstructions steel shutters for spouts and painting
Read moreG e n e r a l - w s m 2 0 2 5 - 2 6 - a n n u a l maintenance of lbmc vazhani canal from ch 0.000 km to 16.000 km and clearing and removing obstructions during summer water distribution for the year 2025-26.-general civil work
Provision for clearing grass twice on both canal&#x0d side before mundakan crop distribution &#x0d summer water distribution silt removal from&#x0d unlined bottom and concreted bed bottom with&#x0d suitable thickness proposed to necessary lengths&#x0d of canal
Read moreGeneral-wsm 2024-25-wsm-emergency - monsoon preparedness-cutting and removing fallen trees and branches of trees of lbmc 0/000 to 16/000 km and kakkinikad di canal and in different chiras of vazhani irrigation project for the year 2024-25-gene
Engaging labour for cutting removing and&#x0d stacking trees for removing slipped earth in&#x0d chiras lbmc and kakkinikkad canal
Read moreGeneral-wsm 2023-24-wsm-emergency - monsoon preparedness-cutting and removing fallen trees and branches of trees of lbmc 0/000 to 16/000 km and kakkinikad diversion canal and in different chiras of vazhani irrigation project for the year 2023-24-gene
Engaging labour for cutting, removing and stacking trees, for removing slipped earth in chiras,lbmc and kakkinikkad canal
Read moreWsm-2025-26-urgent maintenance and clearing removing obstructions clearing light jungle wherever necessary for the period sept. to dec. and march to may of lbmc from ch16/000 39/200 including branch canals for water distribution for 2025-26
Clearing grass, removal of unserviceable earth, providing man mazdoor for clearing obstructions during water distribution providing&#x0d greese and lubrication oil for shutters, earth work for bed concrete,demolishing of existing concrete lining etc
Read moreof your Industry type