Tender Details
Particulars | Details |
---|---|
Title |
Annual Repairing 1 Year Maintenancework Of Hand Pumps In Block Alote District Ratlam 1320 Nos
|
Description |
Annual Repairing 1 Year Maintenancework Of Hand Pumps In Block Alote District Ratlam 1320 Nos
|
Organisation | Public Health Engineering- O/o Engineer In Chief | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2295 |
EMD | 26620 |
Tender Value | |
Place | Block Alote |
Link |
AAAAAAAAAA Login to view |
Start Date | May 20, 2025 16:30 |
End Date |
26/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-ii.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-ii.
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Read moreConstruction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Read moreInstallation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Installation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Read moreGeotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026.
Geotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026.
Read moreAAAAAAAAAA
Login to viewCollection of toll tax from the vehicular traffic plying through the lochan das setu over river ajoy at nutanhat under burdwan north highway division in the district of purba bardhaman.
Read moreRepairing of cc road ward 1 to 40 (annual rate contract)
Repairing of cc road ward 1 to 40 (annual rate contract)
Read moreConstruction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)
Construction of cc road from pahalanpur bazar to kamarpara via mudipara and singhpara within raina-ii block in the district of purba bardhaman (length 1.830 km)
Read moreof your Industry type