Tender Details

Particulars Details
Title
Improvement To Mandwa Katangdhara Nagazari Road, V.R.116, Km 0/00 To 3/500 Tah. Hingna, Dist. Nagpur
Description
Improvement To Mandwa Katangdhara Nagazari Road, V.R.116, Km 0/00 To 3/500 Tah. Hingna, Dist. Nagpur
Organisation Public Works Region | State Govt. and UT
Tender Id 2025_PWR_1156150_1
Reference
Number
NGP/DN.3/Open/B-1/T. N. 34/24-25 S. N. 01
Tender Fee 1680
EMD 1.06 Lakh
Tender Value
Place TAH. HINGNA, DIST. NAGPUR
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2011251
Start Date March 04, 2025 14:30
End Date

11/03/2025 ( Expired 90 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)

Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)

Read more
Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam

Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam

Read more
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)

Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)

Read more
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall

Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise