Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Quarry Fund 23 24 Package No.1 Strengthening Of One Road In Kunnandarkoil Block Pudukkottai District
|
Description |
Quarry Fund 23 24 Package No.1 Strengthening Of One Road In Kunnandarkoil Block Pudukkottai District
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id | 2024_RDTN_430404_1 |
Reference Number |
QUARRY FUND 2023-2024 |
Tender Fee | 0 |
EMD | 82000 |
Tender Value | |
Place | PUDUKKOTTAI |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=511583 |
Start Date | February 26, 2024 14:30 |
End Date |
01/03/2024 ( Expired 494 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreLicensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical 
 college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Read moreHiring of latest model-2025 of 1 no. new jeep (6plus1 seater) sel or utilization period of jeep up to 06 years or 2,50,000 kms. and registration in taxi quota for official/field use of ee (eht-m) dn., mpptcl, jabalpur
Hiring of latest model-2025 of 1 no. new jeep (6plus1 seater) sel or utilization period of jeep up to 06 years or 2,50,000 kms. and registration in taxi quota for official/field use of ee (eht-m) dn., mpptcl, jabalpur
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreStrengthening and improvement of roads under world bank aided project tresp in ompi block under amarpur division, pwd (randb). gr-ii
Strengthening and improvement of roads under world bank aided project tresp in ompi block under amarpur division, pwd (randb). gr-ii
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/865)
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/865)
Read moreConstruction of 2l ps configuration gangapur city bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/866)
Construction of 2l ps configuration gangapur city bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/866)
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreof your Industry type