Tender Details

Particulars Details
Title
Installation Of 01 No. 5 Hp Open Well Pump With All Accessories, Erection Of Pipeline And Round O Clock Operation And Maintenance Of Pump Motor Set For A Period Of 60 Days At Bazari More Under S.B. Project.
Description
Installation Of 01 No. 5 Hp Open Well Pump With All Accessories, Erection Of Pipeline And Round O Clock Operation And Maintenance Of Pump Motor Set For A Period Of 60 Days At Bazari More Under S.B. Project.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_332607_1
Reference
Number
GM/SBA/EnM/e-Tender/24-25/93
Tender Fee 0
EMD 3100
Tender Value
Place Sonepur Bazari Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344801
Start Date March 17, 2025 16:30
End Date

27/03/2025 ( Expired 93 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply,installation and testing of dual solarized pumps with all accessories i.e. solar pv modules, pump motor set, solar panels, mounting structure, controller etc. and providing and fitting of gi quick coupling pipes on turn key basis under procure

Supply,installation and testing of dual solarized pumps with all accessories i.e. solar pv modules, pump motor set, solar panels, mounting structure, controller etc. and providing and fitting of gi quick coupling pipes on turn key basis under procure

Read more
Supplying and installation of 5 nos open well submersible pumps in 5 nos wells and connecting all the pumps to the existing water supply pipeline at rehabilitation site nisarpur tehsil kukshi dist. dhar including material, labour, charges, transporta

Supplying and installation of 5 nos open well submersible pumps in 5 nos wells and connecting all the pumps to the existing water supply pipeline at rehabilitation site nisarpur tehsil kukshi dist. dhar including material, labour, charges, transporta

Read more
Purchase / installation of 10 hp open well vertical submersible motor pump at cn, mukkada

Purchase / installation of 10 hp open well vertical submersible motor pump at cn, mukkada

Read more
Ar m/o wss/lwss under section bhararoo in tehsil joginder nagar district mandi h.p sh providing and supplying of 1.5 hp submersible pump and motor including all accessories

Ar m/o wss/lwss under section bhararoo in tehsil joginder nagar district mandi h.p sh providing and supplying of 1.5 hp submersible pump and motor including all accessories

Read more
Work of m and r of motor starter and pumps as well as round o clock operation of tube wells at new colony and tower for two years in harduaganj thermal power station uprvunl, kasimpur, aligarh, uttar pradesh

Work of m and r of motor starter and pumps as well as round o clock operation of tube wells at new colony and tower for two years in harduaganj thermal power station uprvunl, kasimpur, aligarh, uttar pradesh

Read more
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year

Read more
Providing, installation and commissioning of 01 (one) set 50,000 gph and 75 hp capacity 60 mtr head vt pump-motor set at raw water pump house under dws sub-division santirbazar during the year 2025-26.

Providing, installation and commissioning of 01 (one) set 50,000 gph and 75 hp capacity 60 mtr head vt pump-motor set at raw water pump house under dws sub-division santirbazar during the year 2025-26.

Read more
Design commissioning testing, supply installation of a solar submersible pump with all necessary accessories, including solar pv modules, pump modules, pump motor set, solar panel mounting structure, control unit etc complete job at goma parakachick

Design commissioning testing, supply installation of a solar submersible pump with all necessary accessories, including solar pv modules, pump modules, pump motor set, solar panel mounting structure, control unit etc complete job at goma parakachick

Read more
Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.

Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.

Read more
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.

Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise