Tender Details
Particulars | Details |
---|---|
Title |
Complete Overhauling Of Synchronous Hydro Generator Including Dismantling Of Rotor Poles, Reassembly After Cleaning Of Poles, Bearing Cleaning And Setting, Stator Cleaning, Varnishing And Maintaining Ir And Pl Results, And Alignment And Commissioning
|
Description |
Complete Overhauling Of Synchronous Hydro Generator Including Dismantling Of Rotor Poles, Reassembly After Cleaning Of Poles, Bearing Cleaning And Setting, Stator Cleaning, Varnishing And Maintaining Ir And Pl Results, And Alignment And Commissioning
|
Organisation | HPSEBL | State Govt. and UT |
Tender Id | 2025_HPSEB_101538_1 |
Reference Number |
HPSEBL/GPHD/DB-9/2024-25-51 |
Tender Fee | 590 |
EMD | 4967 |
Tender Value | |
Place | chaba |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=149402 |
Start Date | March 10, 2025 20:30 |
End Date |
17/03/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete overhauling of synchronous hydro generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining ir and pl results, and alignment and commissioning
Complete overhauling of synchronous hydro generator including dismantling of rotor poles, reassembly after cleaning of poles, bearing cleaning and setting, stator cleaning, varnishing and maintaining ir and pl results, and alignment and commissioning
Read moreDismantling cleaning of 3phase syn generator of unit ii make va tech hydro 750 rpm rated output 6mw cleaning of stator rotor and checking conduct necessary tests of stator rotor complete in all along with testing of generator under khauli ph darini
Dismantling cleaning of 3phase syn generator of unit ii make va tech hydro 750 rpm rated output 6mw cleaning of stator rotor and checking conduct necessary tests of stator rotor complete in all along with testing of generator under khauli ph darini
Read moreDesign engineering, manufacturing, fabrication, assembly, supply, installation, testing and commissioning of pre-wired complete numerical relay panels for generator, generator transformer and unit auxiliary transformer protection after dismantling o
Design, engineering, manufacturing, fabrication, assembly, supply, installation, testing and commissioning of pre-wired complete numerical relay panels for generator, generator transformer and unit auxiliary transformer protection after dismantling o
Read moreReplacement of damaged installed stator with repaired stator along with box-up of complete generator bearing inspection and commissioning unit 6 500mw anpara
Replacement of damaged installed stator with repaired stator along with box-up of complete generator bearing inspection and commissioning unit 6 500mw anpara
Read moreMtps i mill plant unit ii dismantling of seal air fan motor and overhauling reassembling setting the alignment of the motor with impeller dismantling cleaning of seal air filters and strengthening of seal air filter frame assembly
Mtps i mill plant unit ii dismantling of seal air fan motor and overhauling reassembling setting the alignment of the motor with impeller dismantling cleaning of seal air filters and strengthening of seal air filter frame assembly
Read moreComplete overhauling of ht motor stator and caca cooler assembly refurbishment of ht motor rotor and bearing housing assembly supply of spares and other accessories with installation testing and commissioning of ht motor of mip 1630 at win platform
Complete overhauling of ht motor stator and caca cooler assembly refurbishment of ht motor rotor and bearing housing assembly supply of spares and other accessories with installation testing and commissioning of ht motor of mip 1630 at win platform
Read moreDismantling, assembling and alignment of the complete generator turbine unit-refurbishment and providing locking arrangement of guide vanes, setting of positioning of all link liver and regulating ring assembly of guide vanes, alignment and assemblin
Dismantling, assembling and alignment of the complete generator turbine unit-refurbishment and providing locking arrangement of guide vanes, setting of positioning of all link liver and regulating ring assembly of guide vanes, alignment and assemblin
Read moreAnnual maintenance of unit number 2 5 and 6 at rihand power station pipri 1 overhauling cleaning and repairing of generator air cooler and painting of and outer surface of generators of above three units varnishing of stator and rotor poles
Annual maintenance of unit number 2 5 and 6 at rihand power station pipri 1 overhauling cleaning and repairing of generator air cooler and painting of and outer surface of generators of above three units varnishing of stator and rotor poles
Read moreSupply, commissioning and testing of hydro jet roller bearing cleaning machine
For complete deion and other details, please refer to tender
Read moreComplete overhauling of 250 mw bhel make generator (including replacement of new rotor), ip turbine overhauling, bearing checking and governing systems and associated works of unit-6, 250 mw, santaldih tps, wbpdcl.
Complete overhauling of 250 mw bhel make generator (including replacement of new rotor), ip turbine overhauling, bearing checking and governing systems and associated works of unit-6, 250 mw, santaldih tps, wbpdcl.