Tender Details
Particulars | Details |
---|---|
Title |
Under The Integrated Development Plan (Ekikrit), Construction Work Of 85.00 M Interlocking Road And Drain From Tejpal House To Nanak House In Didauli Village, Block Joya In District Amroha
|
Description |
Under The Integrated Development Plan (Ekikrit), Construction Work Of 85.00 M Interlocking Road And Drain From Tejpal House To Nanak House In Didauli Village, Block Joya In District Amroha
|
Organisation | U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 779 |
EMD | 11000 |
Tender Value | |
Place | AMROHA |
Link |
AAAAAAAAAA Login to view |
Start Date | April 15, 2025 21:30 |
End Date |
22/04/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreAAAAAAAAAA
Login to viewGhospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreWbphed/01/bwn of se/cc of 2025-26 sl.no.2
Balance work such as construction of approach road sinking of additional tube well construction of pump house land development and other allied work for different pwss under mangolkote block under katwa subdivn within burdwan divn phe dte.
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreImprovement and asphalting work in thaula to kumrada (mundrasera) motor road in district uttarkashi yamunotri assembly in chinyalisaur block under state sector
Improvement and asphalting work in thaula to kumrada (mundrasera) motor road in district uttarkashi yamunotri assembly in chinyalisaur block under state sector
Read moreStrengtheing and damrikarn work on kolakhal-jajedi motor road in pokhra development block under chaubattakhal assembly constituency of district pauri gharwal length 2.50km
Strengtheing and damrikarn work on kolakhal-jajedi motor road in pokhra development block under chaubattakhal assembly constituency of district pauri gharwal length 2.50km
Read moreRectification of blackspot krishi mandi mod from ch 310 900 to 312 100 and kudi village from ch 317 250 to 318 450 of nh 62 under road safety annual plan 2024 25 in the state of rajasthan
Rectification of blackspot krishi mandi mod from ch 310 900 to 312 100 and kudi village from ch 317 250 to 318 450 of nh 62 under road safety annual plan 2024 25 in the state of rajasthan
Read moreConstruction of harijan dharmshala at naya bazar no.05,cons of cc road at naya bazar no. 04 from balram jatav to rajesh ahirwal house,cons of cc road and drain at naya bazar ward no.01 from tamarayi kunaa to mantu latri house,cons of chabutra in nb1
Construction of harijan dharmshala at naya bazar no.05,cons of cc road at naya bazar no. 04 from balram jatav to rajesh ahirwal house,cons of cc road and drain at naya bazar ward no.01 from tamarayi kunaa to mantu latri house,cons of chabutra in nb1
Read moreConstruction of link road from wangail house to rongdo (by way of pcc wall, r/wall, cutting). (under district capex)
Construction of link road from wangail house to rongdo (by way of pcc wall, r/wall, cutting). (under district capex)
Read moreof your Industry type