Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Grass Cutting Works Inside Plant Area (Part E)
|
| Description |
Grass Cutting Works Inside Plant Area (Part E)
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2024_NTPC_93274_1 |
|
Reference Number |
NTPC/Rihand STPS/9900294556 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Rihand Superthermal Power P.O RIHANDNAGAR, DIST. S |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=96490 |
| Start Date | December 28, 2024 18:30 |
| End Date |
Expired
02/01/2025
Expired 629 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of new administrative building (g plus five storey) and allied facilities inside technical area, dmsrde, kanpur
Provision of new administrative building (g plus five storey) and allied facilities inside technical area, dmsrde, kanpur
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreGrass cutting works inside plant area (part-c)
Grass cutting works inside plant area (part-c)
Read moreGrass cutting works inside plant area (part-a)
Grass cutting works inside plant area (part-a)
Read moreAnnual maintenance of grass cutting works inside the township area
Annual maintenance of grass cutting works inside the township area
Read moreAnnual maintenance of grass cutting works inside the township area
Annual maintenance of grass cutting works inside the township area
Read moreJob contract for grass cutting inside plant and offsite area at igstpp jharli jhajjar
Job contract for grass cutting inside plant and offsite area at igstpp jharli jhajjar
Read moreCustom bid for services - gardening and grass cutting jobs inside plant area of bongaigaon refinery
Read more
Biennial contract for grass cutting works in plant area at ntpc simhadri
Biennial contract for grass cutting works in plant area at ntpc simhadri
Read moreof your Industry type