Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Pucca Drain With Top Cover From Sa Ali House Towards Kashim Ali House At Vestpara
|
Description |
Construction Of Pucca Drain With Top Cover From Sa Ali House Towards Kashim Ali House At Vestpara
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2025_ZPHD_821213_1 |
Reference Number |
NIT-08/BGP/2025 SL-04 |
Tender Fee | 250 |
EMD | 2000 |
Tender Value | |
Place | BHINGOLE GRAM PANCHAYAT |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1826901 |
Start Date | February 28, 2025 15:30 |
End Date |
07/03/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc
Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreConstruction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Read moreProject management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk cost of contractor)
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk cost of contractor)
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreImprovement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Read moreof your Industry type