Tender Details

Particulars Details
Title
Fdr/Urgent Construction Of Retaining Wall On Road From Jb Para To Bhagirath Para Part Ii (Length 8.50 Km) / Sh Retaining Wall, Back Filling Etc. Portion From Ch. 0.00 Km To Ch. 4.00 Km. (Group I)
Description
Fdr/Urgent Construction Of Retaining Wall On Road From Jb Para To Bhagirath Para Part Ii (Length 8.50 Km) / Sh Retaining Wall, Back Filling Etc. Portion From Ch. 0.00 Km To Ch. 4.00 Km. (Group I)
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2024_CEPWD_53356_1
Reference
Number
93 /DNIT/SE-V/AMB/2024-25
Tender Fee 4000
EMD 2.91 Lakh
Tender Value
Place Gonda Twisa
Link https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54207
Start Date September 27, 2024 22:00
End Date

04/10/2024 ( Expired 221 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Read more
Up-gradation of rural road from sh 10 sh8 to guptapara ii community hall sh7 under pmgsyiii batch i 2024 25 package no. an01fe111 length 6.200 km

Up-gradation of rural road from sh 10 sh8 to guptapara ii community hall sh7 under pmgsyiii batch i 2024 25 package no. an01fe111 length 6.200 km

Read more
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur

Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur

Read more
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.

Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.

Read more
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.

Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.

Read more
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Read more
Fdr/mtc.of roadsfrom jatanbari fire service road to nildhan para road under jatanbari pwd (randb) sub-division (ch. from 0.00 km to 1.00 km,length- 1.00 km) /sh- grouting, wbm-iii, through-out 25 mm carpeting , sand seal coating and other allied wo

Fdr/mtc.of roadsfrom jatanbari fire service road to nildhan para road under jatanbari pwd (randb) sub-division (ch. from 0.00 km to 1.00 km,length- 1.00 km) /sh- grouting, wbm-iii, through-out 25 mm carpeting , sand seal coating and other allied wo

Read more
Maintenance of road from i.t.d road to east narendranagar via anganwadi centre from ch.0.00km to ch.0.50km total length 0.50km ii. t.d road to hinskang panchayat approach road from ch.0.00 km to ch.0.050 km total length 0.050 km under damcherra s

Maintenance of road from i.t.d road to east narendranagar via anganwadi centre from ch.0.00km to ch.0.50km total length 0.50km ii. t.d road to hinskang panchayat approach road from ch.0.00 km to ch.0.050 km total length 0.050 km under damcherra s

Read more
Maintenance of road from damcherra to khedacherra road at ch.4.50 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, pucca drain,gsb,wbm 3, carpeting, seal coating etc.

Maintenance of road from damcherra to khedacherra road at ch.4.50 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, pucca drain,gsb,wbm 3, carpeting, seal coating etc.

Read more
Mtc of road from adibasighat-burighat road to hanuram para (l-1.30 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh wbm-3, carpeting, seal coat etc portion from ch 0.00km to ch 0.650 km.

Mtc of road from adibasighat-burighat road to hanuram para (l-1.30 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh wbm-3, carpeting, seal coat etc portion from ch 0.00km to ch 0.650 km.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise