Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Installation Metal Beam Crash Barrier Under Road Safety Work Of Existing Road From Km 67.00 To 101.00 Of Nh 75 E New Nh 20 In The State Of Jharkhand For The Year 2024 25
|
Description |
Installation Metal Beam Crash Barrier Under Road Safety Work Of Existing Road From Km 67.00 To 101.00 Of Nh 75 E New Nh 20 In The State Of Jharkhand For The Year 2024 25
|
Organisation | RCD EinC | State Govt. and UT |
Tender Id | 2025_CECOM_98107_1 |
Reference Number |
NH/CHAIBASA/24-25/01 |
Tender Fee | 10000 |
EMD | 2.7 Lakh |
Tender Value | |
Place | from km 67.00 to 101.00 of NH 75 E New NH-20 |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=131903 |
Start Date | January 31, 2025 22:30 |
End Date |
08/02/2025 ( Expired 150 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Read moreImprovement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreImprovement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)
Improvement of riding quality work of jublee chowk (nh-75) to herhanj via nawada (sh-10) road from ch- 2.500 km. to 28.700 km. (total length - 26.200 km.)
Read moreProviding and erection of w metal beam crash barrier along sundernagar hydal channel service road (both sides) from bcw (rd 80 mtr) to silt ejector bsl (p) bbmb sundernagar.
Providing and erection of w metal beam crash barrier along sundernagar hydal channel service road (both sides) from bcw (rd 80 mtr) to silt ejector bsl (p) bbmb sundernagar.
Read moreConstruction of alteranate connectivity for quarab land slide location at km.55 on nh 87 e new 109 improvement work by dbm bc and other safety work between chainage 0.000 to 3.000
Construction of alteranate connectivity for quarab land slide location at km.55 on nh 87 e new 109 improvement work by dbm bc and other safety work between chainage 0.000 to 3.000
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culvertsret.walls and road furniture safety measures with 5 year maintenance mc dng group no-5
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culvertsret.walls and road furniture safety measures with 5 year maintenance mc dng group no-5
Read moreof your Industry type