Tender Details
Particulars | Details |
---|---|
Title |
Reinforcement Work For Installation Of Surapratappur I, Surapratappur Ii And Surapratappur Iv Old Operable Li Ps Of Bhuban Block In Dhenkanal District Under State Plan Grant
|
Description |
Reinforcement Work For Installation Of Surapratappur I, Surapratappur Ii And Surapratappur Iv Old Operable Li Ps Of Bhuban Block In Dhenkanal District Under State Plan Grant
|
Organisation | Orissa Lift Irrigation Corporation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 7080 |
EMD | 17124 |
Tender Value | |
Place | Dhenkanal |
Link |
AAAAAAAAAA Login to view |
Start Date | May 13, 2025 15:30 |
End Date |
20/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSupply and installation of ict equipments for online courts,
Supply and installation of ict equipments for online courts, &#x0d live streaming and paperless court in court complexes under e&#x0d courts project phase iii
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read more2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.
2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.
Read moreWbpwd/pw(r)/sepd/piu-i/nit-08 of 2025-2026,sl-1
Widening and strengthening of ayeshbagh - harirampur road from 0.00 kmp to 17.20 km under murshidabad highway division no. i in the district of murshidabad under ridf xxx. (2nd call)
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read moreof your Industry type