Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Phed/Ae/N Ie T 08/Ksd/2023 24 4
|
Description |
Construction Of Temporary Structures Of Police Staffs In Connection With Gs Mela 2024 Under Kakdwip Sub Division Of Alipore Division, P.H. Engineering Dte. (At Sagar Mela Ground)
|
Organisation | Government of West Bengal |
Tender Id | 2023_PHED_599318_4 |
Reference Number |
WBPHED/AE/NIeT-08/KSD/2023-24 |
Tender Fee | |
EMD | 5153 |
Tender Value | |
Place | OfficeoftheAssistant Engineer,KakdwipSubDivn |
Link | https://wbtenders.gov.in |
Start Date | November 04, 2023 16:30 |
End Date |
28/11/2023 ( Expired 567 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read more04 of ee/rd/phed of 2025-2026
Providing a new setup for drinking water supply of raiganj hospital pwss at raiganj district hospital under raiganj sub-division of uttar dinajpur district under raiganj division phe dte.(tube-well, laying of rising main, laying distribution pipe l
Read moreAAAAAAAAAA
Login to viewSupply, delivery, installation of membrane element for ro unit and other allied work of existing mobile treatment unit located at itahar in the district of uttar dinajpur under malda mechanical division, phe dte.
Read moreAAAAAAAAAA
Login to viewRepairing of existing fire fighting system at old sdh building at prafulla chandra sen government medical college and hospital, arambagh under hooghly construction sub-division no- ii, p.w.d. under hooghly construction division, p.w.d. during the yea
Read moreConstr. of road infra. storm water drain and operation and environment mgmt at r k nagar industrial estate tripura. in connection with construction and maint. of road and storm water drainage system etc. at r.k nagar industrial estate tripura pkg-05
Constr. of road infra. storm water drain and operation and environment mgmt at r k nagar industrial estate tripura. in connection with construction and maint. of road and storm water drainage system etc. at r.k nagar industrial estate tripura pkg-05
Read moreRws/nrdwp/ridf/jjm schemes in north tripura district 2025-26/sh- extension, maintenance of pvc/di pipeline at different location and other allied work under dws sub-division dharmanagar of kdamtala r.d. block
Rws/nrdwp/ridf/jjm schemes in north tripura district 2025-26/sh- extension, maintenance of pvc/di pipeline at different location and other allied work under dws sub-division dharmanagar of kdamtala r.d. block
Read moreRws/nrdwp/ridf/jjm schemes in north tripura district 2025-26/sh- extension, maintenance of pvc/di pipeline at different location and other allied work under dws sub-division dharmanagar of kalacherra r.d. block
Rws/nrdwp/ridf/jjm schemes in north tripura district 2025-26/sh- extension, maintenance of pvc/di pipeline at different location and other allied work under dws sub-division dharmanagar of kalacherra r.d. block
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type