Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Rectification Kip Lbmc Removal Of Silt And Accumulated Waste From Tunnel From Ch 5337 M To 9930 M General Civil Work
|
| Description |
During Water Distribution Through The&Amp#X0d
Canal, There Is A Possibility Of Waste Wood Logs,&Amp#X0d
And Sedimentation Accumulating Inside The&Amp#X0d
Tunnel. This Accumulation Affects The Free Flow&Amp#X0d
Of Water Through The Tunnel.
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_691692_1 |
|
Reference Number |
IRR/PII/TR/2724/2024_5_1_1/1 |
| Tender Fee | 655 |
| EMD | 4444 |
| Tender Value | - |
| Place | Karavaloor |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1076993 |
| Start Date | September 20, 2024 21:30 |
| End Date |
Expired
28/09/2024
Expired 747 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General karavaloor kip canal road work rectification lbmc bund road work between ch 14900m to 15600m general civil work
General karavaloor kip canal road work rectification lbmc bund road work between ch 14900m to 15600m general civil work
Read moreGeneral kip rb urgent rectification of enadimangalam distributory canal between the ch 2500m and ch 4000m general civil work
General kip rb urgent rectification of enadimangalam distributory canal between the ch 2500m and ch 4000m general civil work
Read moreClearing jungle and removal of floating bodies from kip lb kbc 0 to 4000m maravoor distri 0 to 8162m and maravoor minor ch. 0 to 3175m and removal of floating bodies from lbmc from 41762to 56016m of section no.19/13 kollam
Clearing jungle and removal of floating bodies from kip lb kbc 0 to 4000m maravoor distri 0 to 8162m and maravoor minor ch. 0 to 3175m and removal of floating bodies from lbmc from 41762to 56016m of section no.19/13 kollam
Read moreGeneral action plan 2026 27 kip lb annual maintenance of lbmc from ch 29000m to ch 41762 plappally minor distributory nellikkunnam distributory nellikkunnam minor distributory and poovattoor distributory and poovattoor minor distributory general ci
General action plan 2026 27 kip lb annual maintenance of lbmc from ch 29000m to ch 41762 plappally minor distributory nellikkunnam distributory nellikkunnam minor distributory and poovattoor distributory and poovattoor minor distributory general ci
Read moreGeneral kip o m section no 7 2 kalanjoor rectification works of konni distributory between ch 1323 m 1560m and between ch 15400 to 17800m general civil work
General kip o m section no 7 2 kalanjoor rectification works of konni distributory between ch 1323 m 1560m and between ch 15400 to 17800m general civil work
Read moreGeneral kip o m section no 7bar2 kalanjoor rectification works kalanjoor distributory canal between ch 15 m to 2400 m general civil work
General kip o m section no 7bar2 kalanjoor rectification works kalanjoor distributory canal between ch 15 m to 2400 m general civil work
Read moreFlood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near shree devi temple shiroli keri in poriem constituency
Flood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near shree devi temple shiroli keri in poriem constituency
Read moreGeneral action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam north canal from ch 0 to 7340m general civil work
General action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam north canal from ch 0 to 7340m general civil work
Read moreGeneral action plan 2026 27 kip lburgent rectification of nellikkunnam distributary between ch 2800 m and 3100 m in ummannoor grama panchayath general civil work
General action plan 2026 27 kip lburgent rectification of nellikkunnam distributary between ch 2800 m and 3100 m in ummannoor grama panchayath general civil wor
Read moreGeneral action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam south canal at ch 0 to 9400 m general civil work
General action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for nediyapadam south canal at ch 0 to 9400 m general civil work
Read moreof your Industry type