Tender Details
Particulars | Details |
---|---|
Title |
Urgent Bc Renewal Works Of Thrissur Kuttippuram Road From Km 34/750 To 35/050,43/290 To 43/400, 46/680 To 46/800 And 52/300 To 52/530
|
Description |
Urgent Bc Renewal Works Of&Amp#X0d
Thrissur Kuttippuram Road From Km 34/750 To&Amp#X0d
35/050,43/290 To 43/400, 46/680 To 46/800 And&Amp#X0d
52/300 To 52/530 General Civil Work 1 In&Amp#X0d
Malappuram District
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_683207_1 |
Reference Number |
D4/PWD/RB/102094/2024-25 Dtd 31.07.2024 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Ponnani |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1068407 |
Start Date | August 19, 2024 19:00 |
End Date |
27/08/2024 ( Expired 286 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Surfacing works of gsb 15 cm thick wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreMtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Read moreMtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.65 km to ch.1.21 km under matabari block, gomati, tripura/s.h. patch repairing, patch carpetting and allied works during the year 2025-26. (group-ii)
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.65 km to ch.1.21 km under matabari block, gomati, tripura/s.h. patch repairing, patch carpetting and allied works during the year 2025-26. (group-ii)
Read moreImprovement of ravi talkies to tankapani road dibakar marg from rd 0.00km to 1.915 k both side n periodical renewal coat and from rd 1.657 km to 1.915 km left side such as construction of rcc drain at left side for the year 2025-26.
Improvement of ravi talkies to tankapani road dibakar marg from rd 0.00km to 1.915 k both side n periodical renewal coat and from rd 1.657 km to 1.915 km left side such as construction of rcc drain at left side for the year 2025-26.
Read moreSurface renewal and other works in km 0.00 to 3.00 of satsang chowk to baijnathpur via rikhiya more (circular road) road under shrawani mela for the year 2025-26
Surface renewal and other works in km 0.00 to 3.00 of satsang chowk to baijnathpur via rikhiya more (circular road) road under shrawani mela for the year 2025-26
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreProviding and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf
Providing and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf
Read moreProviding and laying of wmm 7.5 cm, dbm 6.00 cm and bc 4.00 cm including cleaning of rd surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 0 km 30 on road pithewala-kalibuli-bahla under 96 rcc/45 tf
Providing and laying of wmm 7.5 cm, dbm 6.00 cm and bc 4.00 cm including cleaning of rd surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 0 km 30 on road pithewala-kalibuli-bahla under 96 rcc/45 tf
Read moreof your Industry type