Tender Details
About Tender
🚂 Procurement Notice: Transmission Line Fittings Shift For Rob Construction 🛣️🔧 The Ministry Of Railways, Specifically The Central Government Ministry/Department, Has Issued A Procurement Notice For The Shifting Of Existing 110 Kv, 3 Phase Ac Transmission Line Fittings At Ne I Tower No. 40/1 & 40/2 In Titwala, Kalyan District, Mumbai Division. This Is In Connection With The Construction Of Four Lane Road Over Bridge (Rob) Approaches At Titwala (Km. 64/30 31) Between Titwala Khadavli Station. 📅 Bid Submission Deadline: April 22, 2024, 11:00 Am Interested Bidders Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 249,700. Bids Should Be Comprehensive, Detailing The Methodology For The Safe And Efficient Shifting Of The Transmission Line Fittings, Adhering To All Safety And Technical Standards. Keywords: Ministry Of Railways, Transmission Line Fittings, Rob Construction, Mumbai Division, Procurement, Tender, Emd, Central Government Ministry/DepartmentParticulars | Details |
---|---|
Title |
Shifting Of Existing Of 110 Kv, 3 Phase Ac Transmission Line Fittings Of Ne I Tower No. 40/1 &Amp 40/2 At Titwala Of Kalyan District In Mumbai Division In Connection With Construction Of Four Lane Rob Approaches At Titwala (Km. 64/30 31) Between Titwala Khadavli Station Of Mumbai Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74349931 |
Reference Number |
KYNLD-585-W-739-Cont-Dep |
Tender Fee | 0 |
EMD | 2.5 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74349931/viewNitPdf_4522046.pdf |
Start Date | March 28, 2024 20:34 |
End Date |
22/04/2024 ( Expired 392 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreShifting of existing 33 kv, 11 kv, l .t overhead and underground lines due to construct of 2 lane rob between dm awas to khanalampura yard (star paper mills) at nagal saharanpur road, sampar-84 ac(phase-2) km.177/13-15 distt. saharanpur
Shifting of existing 33 kv, 11 kv, l .t overhead and underground lines due to construct of 2 lane rob between dm awas to khanalampura yard (star paper mills) at nagal saharanpur road, sampar-84 ac(phase-2) km.177/13-15 distt. saharanpur
Read moreShifting of existing 33 kv, 11 kv, l .t overhead and underground lines due to construct of 2 lane r o b between dm awas to khanalampura yard (star paper mills) at nagal saharanpur road, sampar-84 ac (phase-2) km.177/13-15 distt. saharanpur
Shifting of existing 33 kv, 11 kv, l .t overhead and underground lines due to construct of 2 lane r o b between dm awas to khanalampura yard (star paper mills) at nagal saharanpur road, sampar-84 ac (phase-2) km.177/13-15 distt. saharanpur
Read moreShifting of existing eb poles and rmu in thirumangalam andwest metro madurai division of tangedco for the work of widening from two lane paved shoulder to four lane and strengthening including construction of retaining wall, drain and reconstruction
Shifting of existing eb poles and rmu in thirumangalam andwest metro madurai division of tangedco for the work of widening from two lane paved shoulder to four lane and strengthening including construction of retaining wall, drain and reconstruction
Read moreBalance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Read moreModification to the existing ohe in connection with the construction of rob near titwala station at km.64/30-31 in kalyan-igatpuri section in mumbai division of central railway.
For complete deion and other details, please refer to tender
Read moreShifting of existing of 110kv, 3 phase ac transmission line fittings of se-i tower no.79/13 to 80/3 at bhangarwadi railway gate no.32 of lonavla district in mumbai division
For complete deion and other details, please refer to tender
Read moreShifting of existing of 110kv, 3 phase ac transmission line fittings of se-i tower no.79/13 to 80/3 at bhangarwadi railway gate no.32 of lonavla district in mumbai division
For complete deion and other details, please refer to tender
Read moreJjm- ambalappara grama panchayath - connection shifting from existing old damaged ac pipe and smaller dia. pvc pipes and interconnection works between new lines in various wards of ambalappara gp -discarding the existing damaged old ac pipes lower di
Jjm- ambalappara grama panchayath - connection shifting from existing old damaged ac pipe and smaller dia. pvc pipes and interconnection works between new lines in various wards of ambalappara gp -discarding the existing damaged old ac pipes lower di
Read moreUtility shifting of existing rising main pipe line of 450mm dia d.i. pipe between durga soren chowk to namkum rob due to widening existing road into four lane road by road construction department road division, ranchi rural, under d.w.and s. sw. dist
Utility shifting of existing rising main pipe line of 450mm dia d.i. pipe between durga soren chowk to namkum rob due to widening existing road into four lane road by road construction department road division, ranchi rural, under d.w.and s. sw. dist
Read moreof your Industry type