Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wheat Handling 2025 26 Work At All Wheat Purcase Center Barabanki
|
| Description |
Wheat Handling 2025 26 Work At All Wheat Purcase Center Barabanki
|
| Organisation | Department of Food and Civil Supplies | State Govt. and UT |
| Tender Id | 2025_DOFCS_1015106_1 |
|
Reference Number |
5115_WHEAT _HANDLING_2025_26 BARABANKI |
| Tender Fee | 590 |
| EMD | 10000 |
| Tender Value | - |
| Place | BARABANKI |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1828317 |
| Start Date | March 07, 2025 22:30 |
| End Date |
Expired
12/03/2025
Expired 556 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and painting work of exterior walls and internal corridors of all hostel buildings at aiims patna
Repair and painting work of exterior walls and internal corridors of all hostel buildings at aiims patna
Read moreConstruction of storm water drains to all internal roads of ip - kondapur at kondapur(v), manoharabad(m), medak district.
Construction of storm water drains to all internal roads of ip - kondapur at kondapur(v), manoharabad(m), medak district.
Read moreConstruction of conference hall at vikarabad of vikarabad district(balance work)
Construction of conference hall at vikarabad of vikarabad district(balance work)
Read moreHiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Hiring of 5 no.s of 15t capacity tippers for re-handling of coal at ktroc, jvroc and rchp kothagudem area for a period of 2 years
Read moreConstruction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Read moreHiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Read moreBalance work to multipurpose community hall at kandiguda in ward no.14, kapra of kapra circle-7, mmc(rs.40.00 lakhs)
Balance work to multipurpose community hall at kandiguda in ward no.14, kapra of kapra circle-7, mmc(rs.40.00 lakhs)
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreSupply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type