Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 23 Nos. Brick Type Ventillation Stoppings(1 Nos. Stopping At Main Dip(44 L/Md Cd 1) And 22 Nos. Stoppings To Course Air For The 2nd Phase Of Air Coursinh In Wp Ve 2) At Nandira Colliery, Talcher Area.
|
Description |
Construction Of 23 Nos. Brick Type Ventillation Stoppings(1 Nos. Stopping At Main Dip(44 L/Md Cd 1) And 22 Nos. Stoppings To Course Air For The 2nd Phase Of Air Coursinh In Wp Ve 2) At Nandira Colliery, Talcher Area.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_320283_1 |
Reference Number |
SO(M)/e-Tender/24-25/03 DTD. 30.10.2024 |
Tender Fee | 0 |
EMD | 20400 |
Tender Value | |
Place | Nandira Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=332006 |
Start Date | October 30, 2024 20:30 |
End Date |
18/11/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Transportation of drive heads, motors, belt structures etc along with all its related accessories for 04 (four) nos. of conveyor belts and installation in wp-ve-2 at nandira colliery, talcher area.
Read moreConstruction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area
Construction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area
Read moreConstruction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.
Construction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.
Read moreConstruction of 4 nos rcc isolation stopping for sealing of incline no 5-6 and also to seal the top mouth of the air shaft and erection of 1 no rcc wall near main mechanical ventilator at 5-6 incline of jamuna 1-2 ug mine of jamuna kotma area
Construction of 4 nos rcc isolation
 stopping for sealing of incline no 5-6
 and also to seal the top mouth of the air
 shaft and erection of 1 no rcc wall near
 main mechanical ventilator at 5-6
 incline of jamuna 1-2 ug mine of
 jamuna kotma area
Read moreConstruction of 23 nos. brick type ventillation stoppings(1 nos. stopping at main dip(44l/md-cd-1) and 22 nos. stoppings to course air for the 2nd phase of air coursinh in wp-ve-2) at nandira colliery, talcher area.
Construction of 23 nos. brick type ventillation stoppings(1 nos. stopping at main dip(44l/md-cd-1) and 22 nos. stoppings to course air for the 2nd phase of air coursinh in wp-ve-2) at nandira colliery, talcher area.
Read moreReplacement of damaged bottom idler 228 nos and top idler 190 nos by new top and bottom idler at tb 1 tb 2 and 19 dip 1st and 2nd belt including lowering transportation and fitting at mill incline of shankarpur colliery under bankola area.
Replacement of damaged bottom idler 228 nos and top idler 190 nos by new top and bottom idler at tb 1 tb 2 and 19 dip 1st and 2nd belt including lowering transportation and fitting at mill incline of shankarpur colliery under bankola area.
Read moreTransportation of drive heads and belt structures for two (02) nos. of conveyor belts from surface and installation in wp-ve-1 district at nandira colliery
Transportation of drive heads and belt structures for two (02) nos. of conveyor belts from surface and installation in wp-ve-1 district at nandira colliery.
Read moreConstruction of 08(eight) nos of p.c.c. ventilation stopping in between 44l and 45l in 1 (el) dip, 0 (main dip) and 1(wl) dip and in between 1st and 2nd dip in 45l, 46l, 47l, 48l and 49l in 5 and 6 no incline at shampur-b colliery.
Construction of 08(eight) nos of p.c.c. ventilation stopping in between 44l and 45l in 1 (el) dip, 0 (main dip) and 1(wl) dip and in between 1st and 2nd dip in 45l, 46l, 47l, 48l and 49l in 5 and 6 no incline at shampur-b colliery.
Read moreof your Industry type