🏗️ Invitation For Bids: Construction Services At Shampur B Colliery 🏗️ Eastern Coalfields Limited (Ecl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of Eight P.C.C. Ventilation Stopping Structures At Shampur B Colliery. 🛠️ 📅 Bid Submission Deadline: May 25, 2024, 5:00 Pm The Project Involves The Construction Of Ventilation Stopping Structures At Various Levels And Inclines As Specified In The Tender Documents. Interested Bidders Must Submit A Tender Fee Of Inr 5000/ And Adhere To The Detailed Project Requirements Outlined In The Tender. Keywords: Construction, P.C.C. Ventilation Stopping, Eastern Coalfields Limited, Colliery, Infrastructure Project, Government Tender, Bid Submission
Particulars Details
Title
Construction Of 08(eight) Nos Of P.C.C. Ventilation Stopping In Between 44 L And 45 L In 1 (El) Dip, 0 (Main Dip) And 1(wl) Dip And In Between 1st And 2nd Dip In 45 L, 46 L, 47 L, 48 L And 49 L In 5 And 6 No Incline At Shampur B Colliery.
Description
Construction Of 08(eight) Nos Of P.C.C. Ventilation Stopping In Between 44 L And 45 L In 1 (El) Dip, 0 (Main Dip) And 1(wl) Dip And In Between 1st And 2nd Dip In 45 L, 46 L, 47 L, 48 L And 49 L In 5 And 6 No Incline At Shampur B Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_307715_1
Reference
Number
ECL/GM/MA/SRV/ 24-25/954/ E-03 Date.07.05.2024
Tender Fee 0
EMD 5000
Tender Value
Place ECL, MUGMA AREA.
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318865
Start Date May 15, 2024 19:30
End Date

25/05/2024 ( Expired 359 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area

Construction of 04 (four) nos. new ventilation stopping at 1dip/0l, 1-2(s)dip/0l in between 1-2(s)dip/1l and 1l/13dip in place of broken/damaged old ventilation stopping in dobrana (r-v) seam of belbaid colliery under kunustoria area

Read more
Construction of 08 (eight) nos. ventilation stopping at sp top seam in different places through 27/28 incline of hariajam colliery.

Construction of 08 (eight) nos. ventilation stopping at sp top seam in different places through 27/28 incline of hariajam colliery.

Read more
Construction of (02) two nos of p.c.c ventilation stopping in between 01 and 02 dip off 2l and in between 02 and 03 dip off 2l to maintain ventilation standard in working district in 2 and 7 no inc and construction of (07) seven nos of p.c.c ventilat

Construction of (02) two nos of p.c.c ventilation stopping in between 01 and 02 dip off 2l and in between 02 and 03 dip off 2l to maintain ventilation standard in working district in 2 and 7 no inc and construction of (07) seven nos of p.c.c ventilat

Read more
Repairing six (06) nos. ventilation stoppings 40l/3d-2d, 40l/3d-4d, 41l/3d-4d, 44l to 46l/3d-4d, and cleaning side of ventilation stopping in r-v seam of khottadih colliery, pandaveswar area

Repairing six (06) nos. ventilation stoppings 40l/3d-2d, 40l/3d-4d, 41l/3d-4d, 44l to 46l/3d-4d, and cleaning side of ventilation stopping in r-v seam of khottadih colliery, pandaveswar area

Read more
Repairing twelve (12) nos. sec. stopping at 41l to 43l/32d-33d, 33d and 34d/43l-44l, 44l-46l/34d-35d, 35d to 38d/47l-48l in r-vi seam of khottadih colliery, pandaveswar area

Repairing twelve (12) nos. sec. stopping at 41l to 43l/32d-33d, 33d and 34d/43l-44l, 44l-46l/34d-35d, 35d to 38d/47l-48l in r-vi seam of khottadih colliery, pandaveswar area

Read more
Construction of 07 seven nos. of p.c.c ventilation stopping in between 06th and 07th dip off 45l, 46l, 47l, 48l,49l, 50l and 51l to maintain ventilation standard in working district in 2 and 7 no inc. of shampur-b colliery.

Construction of 07 seven nos. of p.c.c ventilation stopping in between 06th and 07th dip off 45l, 46l, 47l, 48l,49l, 50l and 51l to maintain ventilation standard in working district in 2 and 7 no inc. of shampur-b colliery.

Read more
Construction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.

Construction of 08 nos. p.c.c. ventilation stopping at g.p. seam at main dip / haulage dip district from 23 e/l to 30 e/l through 5/6 no incline of hariajam colliery.

Read more
Construction of 08 eight nos. of rcc retaining wall 05 five nos. in 5and6 incline and 03 three nos in 2 and 7 incline at shampur-b colliery.

Construction of 08 eight nos. of rcc retaining wall 05 five nos. in 5and6 incline and 03 three nos in 2 and 7 incline at shampur-b colliery.

Read more
Dyke and jhama cutting in between 37l off 3rd dip and 38l off 4th dip (geological disturbance) in 2 and 7 no incline at shampur-b colliery.

Dyke and jhama cutting in between 37l off 3rd dip and 38l off 4th dip (geological disturbance) in 2 and 7 no incline at shampur-b colliery.

Read more
Replace with new pipe range of vertical borehole from surface to dishergarh r-iv seam at 0 dip in between 1st dip 2nd level of ningha colliery

Replace with new pipe range of vertical borehole from surface to dishergarh r-iv seam at 0 dip in between 1st dip 2nd level of ningha colliery