Tender Details

About Tender

🔌 Bharat Sanchar Nigam Limited (Bsnl) Rfp For Earthing System Upgrade 📡 Bharat Sanchar Nigam Limited (Bsnl), A Government Of India Enterprise, Is Issuing A Request For Proposal (Rfp) For The Making And Reconditioning Of Ac And Dc Earthing Systems At Existing Bts/Node B Sites Planned For 4 G Upgradation Under Phase Ix.2 Project At Jabalpur, Madhya Pradesh. 📅 Submission Deadline: May 25, 2024, 3:00 Pm Tender Fee: Inr 590 Earnest Money Deposit (Emd): Inr 107,94 Interested Bidders Should Possess The Necessary Technical Expertise And Experience In The Telecommunications Sector, With A Focus On Earthing Systems. Proposals Should Include Detailed Technical Specifications, Pricing, And A Timeline For The Completion Of The Project. Keywords: Bharat Sanchar Nigam Limited, Earthing System, 4 G Upgradation, Rfp, Telecommunications, Bts/Node B, Jabalpur, Madhya Pradesh, Government Of India Enterprise, Public Sector Undertaking
Particulars Details
Title
Making And Reconditioning Of Ac Dc Earthing System Oa Jabalpur M.P. Revised
Description
Making And Reconditioning Of Ac Dc Earthing System At Existing Bts Node B Sites Planned For 4 G Upgradation Under Phase Ix.2 Project At Balance Sites Of Oa Jabalpur M.P. Revised
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2024_BSNL_195887_1
Reference
Number
NIT(9 )/EE (E)/BSNL/JBP/2024-25/
Tender Fee 590
EMD 10794
Tender Value
Place Jabalapur
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=214396
Start Date May 17, 2024 23:30
End Date

25/05/2024 ( Expired 386 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Notice inviting tender for selection of system integrator (si) to design, develop, implement and maintain erp system of ifsca

Notice inviting tender for selection of system integrator (si) to design, develop, implement and maintain erp system of ifsca

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Selection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years

Selection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years

Read more
Design, engineering, manufacturing, testing, supply of two sets of 220kv complete emergency restoration system (ers) each having four towers (2 suspension and 2 tension).

Design, engineering, manufacturing, testing, supply of two sets of 220kv complete emergency restoration system (ers) each having four towers (2 suspension and 2 tension).

Read more
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512

Read more
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.

Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.

Read more
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..

Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise