Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Vadkhal Alibag Nh 166 A Km 0.00 To Km 22.200 On Epc Mode In The State Of Maharashtra
|
| Description |
Strengthening Of Vadkhal Alibag Nh 166 A Km 0.00 To Km 22.200 On Epc Mode In The State Of Maharashtra
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_853495_1 |
|
Reference Number |
No.NHD/PEN/AB/TC/728/2024-25 |
| Tender Fee | 10000 |
| EMD | 39.4 Lakh |
| Tender Value | - |
| Place | PEN |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=897264 |
| Start Date | March 18, 2025 15:30 |
| End Date |
Expired
09/05/2025
Expired 523 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreDesign, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreDesign, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreConsultancy services for authoritys engineer for supervision of 1)strengthening of vadkhal alibag nh 166a km 0.00 to km 22.200 on epc mode in the state of maharashtra 2)rehabilitation and upgradation existing highway to 2 lane 4 lane with paved sh
Consultancy services for authoritys engineer for supervision of 1)strengthening of vadkhal alibag nh 166a km 0.00 to km 22.200 on epc mode in the state of maharashtra 2)rehabilitation and upgradation existing highway to 2 lane 4 lane with paved sh
Read moreStrengthening of nh 166a to two lane paved shoulder from km 0.000 to km 22.200 of vadhkal alibag road for design length 22.200 km in raigad district in the state of maharashtra on epc mode
Strengthening of nh 166a to two lane paved shoulder from km 0.000 to km 22.200 of vadhkal alibag road for design length 22.200 km in raigad district in the state of maharashtra on epc modee
Read moreMaintenance of wadkhal-alibag section on nh 166a from km 0.000 to km 22.200 during monsoon 2nd call
Maintenance of wadkhal-alibag section on nh 166a from km 0.000 to km 22.200 during monsoon 2nd call
Read moreStrengthening of nh 566 from km. 0.00 to km. 4.00 dhavali bypass on epc mode in the state of goa under nh o annual plan 2023-24.
Strengthening of nh 566 from km. 0.00 to km. 4.00 dhavali bypass on epc mode in the state of goa under nh o annual plan 2023-24.
Read moreConstruction of vup at km 22.200 (gondkhairi t- junction) on nagpur-kondhali section of nh-53 in the state of maharashtra on epc mode
Construction of vup at km 22.200 (gondkhairi t- junction) on nagpur-kondhali section of nh-53 in the state of maharashtra on epc mode
Read moreStrengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand
Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand
Read moreof your Industry type