Tender Details

Particulars Details
Title
Strengthening Of Vadkhal Alibag Nh 166 A Km 0.00 To Km 22.200 On Epc Mode In The State Of Maharashtra
Description
Strengthening Of Vadkhal Alibag Nh 166 A Km 0.00 To Km 22.200 On Epc Mode In The State Of Maharashtra
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_853495_1
Reference
Number
No.NHD/PEN/AB/TC/728/2024-25
Tender Fee 10000
EMD 39.4 Lakh
Tender Value -
Place PEN
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=897264

Start Date March 18, 2025 15:30
End Date
Expired 09/05/2025

Expired 523 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call

Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call

Read more
Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.

Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.

Read more
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria

Read more
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years

Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years

Read more
Consultancy services for authoritys engineer for supervision of 1)strengthening of vadkhal alibag nh 166a km 0.00 to km 22.200 on epc mode in the state of maharashtra 2)rehabilitation and upgradation existing highway to 2 lane 4 lane with paved sh

Consultancy services for authoritys engineer for supervision of 1)strengthening of vadkhal alibag nh 166a km 0.00 to km 22.200 on epc mode in the state of maharashtra 2)rehabilitation and upgradation existing highway to 2 lane 4 lane with paved sh

Read more
Strengthening of nh 166a to two lane paved shoulder from km 0.000 to km 22.200 of vadhkal alibag road for design length 22.200 km in raigad district in the state of maharashtra on epc mode

Strengthening of nh 166a to two lane paved shoulder from km 0.000 to km 22.200 of vadhkal alibag road for design length 22.200 km in raigad district in the state of maharashtra on epc modee

Read more
Maintenance of wadkhal-alibag section on nh 166a from km 0.000 to km 22.200 during monsoon 2nd call

Maintenance of wadkhal-alibag section on nh 166a from km 0.000 to km 22.200 during monsoon 2nd call

Read more
Strengthening of nh 566 from km. 0.00 to km. 4.00 dhavali bypass on epc mode in the state of goa under nh o annual plan 2023-24.

Strengthening of nh 566 from km. 0.00 to km. 4.00 dhavali bypass on epc mode in the state of goa under nh o annual plan 2023-24.

Read more
Construction of vup at km 22.200 (gondkhairi t- junction) on nagpur-kondhali section of nh-53 in the state of maharashtra on epc mode

Construction of vup at km 22.200 (gondkhairi t- junction) on nagpur-kondhali section of nh-53 in the state of maharashtra on epc mode

Read more
Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand

Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise