Tender Details

Particulars Details
Title
Chanderiya Ratlam Section : Construction Of Subway (Rub) In Lieu Of Lc No. 165(km: 317/15 17) And Lc No. 187(km: 362 / 32 34 ) By Ing Relieving Girder And Laying The Box(es) By Pushing The Box Below The Relieving Girder.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 73634242
Reference
Number
RTM-2023-24-164
Tender Fee 0
EMD 8.37 Lakh
Tender Value -
Place Mumbai
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73634242/viewNitPdf_4483464.pdf

Start Date February 21, 2024 22:58
End Date
Expired 18/03/2024

Expired 944 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc

Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc

Read more
Hyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.

Hyb division: sc-mue section: construction of road under bridge in lieu of lc no. 255 at km 616/700-800 between cavalry barracks & malkajgiri station by air pushing method with rh girder.

Read more
1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

1)sbc-mys section: proposed construction of road under bridge as rcc box of size 1x9.0x4.5m (clear ht) in lieu of lc no.10 at km: 10/900-11/000 between kengeri & ramanagara stations 2)bangarpet - marikuppam section: proposed construction of road over bridge (1x36m composite girder + 2x20.0m c/c psc girder+7x20.0m c/c psc girder + re blocks) with approaches and subway (1x6mx2.75m (clear ht) rcc box) in lieu of lc no.7 at railway km 11/600-700 near ooragum railway station 3)bypl-dmm section:

Read more
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Sub work 2- elimination of level crossings gates-lc nos.234 235 & 236 by constructing road under bridges between chinnaganjam - vetapalem stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india

Sub work 2- elimination of level crossings gates-lc nos.234 235 & 236 by constructing road under bridges between chinnaganjam - vetapalem stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india

Read more
Sub work 1: elimination of level crossings gates-lc nos.201, 202 & 204 by constructing road under bridges between surareddipelam - ongole stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india

Sub work 1: elimination of level crossings gates-lc nos.201, 202 & 204 by constructing road under bridges between surareddipelam - ongole stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india

Read more
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.

(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.

Read more
Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)

Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)

Read more
Construction of limited height subway (lhs) in lieu of existing manned level crossings (1)lc no.23 at km 99/18-20 in between hcnr & nkw stations, (2) lc no.14 at km 55/23-25 in between gadh & kdjr stations (3) lc no.08 at km 44/18-16 in between gadh & prnr on jkpr-jrli line and (4) lc no. cp-1 at km 411/15-1 7 in between ctc & kdrp stations on ctc-prdp line of khurda road division. (by air pushing technique)

Construction of limited height subway (lhs) in lieu of existing manned level crossings (1)lc no.23 at km 99/18-20 in between hcnr & nkw stations, (2) lc no.14 at km 55/23-25 in between gadh & kdjr stations (3) lc no.08 at km 44/18-16 in between gadh & prnr on jkpr-jrli line and (4) lc no. cp-1 at km 411/15-1 7 in between ctc & kdrp stations on ctc-prdp line of khurda road division. (by air pushing technique)

Read more
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise