Tender Details
Particulars | Details |
---|---|
Title |
Ratlam Division : Construction Of Subway (Rub) In Lieu Of Lc No. 227 (Km: 457/09 10), Lc No. 230 (Km: 464/16 17), Lc No. 234 (Km: 472/14 15), Lc No. 237 (Km: 477/05 06) In Ratlam Khandwa Section And Lc No. 01 (Km: 2/9 3/0) &Amp 02 (Km: 05/07 08) In Rau Dhd Section By Ing Relieving Girder And Laying The Box(es) By Pushing The Box Below The Relieving Girder.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72088804 |
Reference Number |
RTM-2023-24-141 |
Tender Fee | 0 |
EMD | 24.56 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72088804/viewNitPdf_4398127.pdf |
Start Date | December 29, 2023 18:00 |
End Date |
30/01/2024 ( Expired 449 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hubballi division:gadag-hotgi( gdg-hg) section: construction of limited height subway in lieu of lc no.110 km 243/7-8 in between indi road - lahyan (idr-lhn) station respectively by box pushing method.
For complete deion and other details, please refer to tender
Read moreConstruction of rub (full height subway) between chbt-byl station (box pushing method) at km.732/13-15 (732.707) for traffic facility in lieu of mohabhatta gate (lc no.372) of raipur division.
For complete deion and other details, please refer to tender
Read moreKhandwa-itarsi section - construction of limited height subway in lieu of level crossing no. 205 at km. 671/20-22 (non-interlocked engineering gate) as 1/5.00 x 4.50 m rcc box with using rh girder (cut and cover method)
For complete deion and other details, please refer to tender
Read moreHubballi division: gadag-hotgi (gdg-hg) section construction of limited height subway in of lc no.62 km 143/900-144/0 in between wandal-basavanbagewadi (wdl-bsrx) station respectively by box pushing method.
For complete deion and other details, please refer to tender
Read moreS&t work in connection with:- (a) construction of subway in lieu of lc gate no 37/spl at km 234/7-8 in bet stn nile-dgle in az-nfk section of malda division., (b) construction of subway in lieu of lc gate no 44/spl at km 240/5-6 in bet stn nile-dgle in az-nfk section of malda division, (c) construction of subway in lieu of lc gate no 39/spl at km 237/7-8 in bet stn nile-dgle in az-nfk section of malda division, (d) construction of subway in lieu of lc gate
For complete deion and other details, please refer to tender
Read moreLonda-miraj section construction of rub of size 1x5.5x5.5m segmental rcc twin boxes in lieu of lc no.380 at km.606/800-607/000 between desur & belgavi stations by box pushing method. (composite work)
For complete deion and other details, please refer to tender
Read moreKhandwa-itarsi section - construction of limited height subway in lieu of level crossing no. 205 at km. 671/20-22 (non-interlocked engineering gate) as 1/5.00 x 4.50 m rcc box with using rh girder (cut and cover method)
For complete deion and other details, please refer to tender
Read moreRatlam-neemach section :construction of rub between br.no. 429 and 430 by ing relieving girder and laying the box(es) by pushing the box below the relieving girder.
For complete deion and other details, please refer to tender
Read moreConstruction of rub (full height subway) between chbt-byl station (box pushing method) at km.732/13-15 (732.707) for traffic facility in lieu of mohabhatta gate (lc no.372) of raipur division.
For complete deion and other details, please refer to tender
Read moreRajkot division - s&t work in connection with (i)providing rub of box 4x2.5 size by pushing method km.674.05 near closed lc-72 between than-lmc on sunr-wkr section (ii)providing rob in lieu of lc no.233 at km 880/7-8 between mdpr-kmbl section.
For complete deion and other details, please refer to tender
Read moreof your Industry type