Tender Details
Particulars | Details |
---|---|
Title |
Under The State Disaster Reduction ,The Necessary Temporary Protective Work Is Being Carried Out To Pr Additional Damage In Future To The Damaged Road Due To Excessive Water Flow Of Gola River From Vanbhulpura Railway Crossing To Gola Bridge In
|
Description |
Under The State Disaster Reduction ,The Necessary Temporary Protective Work Is Being Carried Out To Pr Additional Damage In Future To The Damaged Road Due To Excessive Water Flow Of Gola River From Vanbhulpura Railway Crossing To Gola Bridge In
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 3.1 Lakh |
Tender Value | |
Place | Haldwani |
Link |
AAAAAAAAAA Login to view |
Start Date | June 06, 2025 20:30 |
End Date |
13/06/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Under the state disaster reduction ,the necessary temporary protective work is being carried out to pr additional damage in future to the damaged road due to excessive water flow of gola river from vanbhulpura railway crossing to gola bridge in
Under the state disaster reduction ,the necessary temporary protective work is being carried out to pr additional damage in future to the damaged road due to excessive water flow of gola river from vanbhulpura railway crossing to gola bridge in
Read moreUnder the state plan, reconstruction and surface improvement work of the road damaged due to excessive flow of water of gaula river from banbhulpura railway crossing to gola bridge under lalkuan assembly constituency of nainital district.
Under the state plan, reconstruction and surface improvement work of the road damaged due to excessive flow of water of gaula river from banbhulpura railway crossing to gola bridge under lalkuan assembly constituency of nainital district.
Read moreUnder the state plan, reconstruction and surface improvement work of the road damaged due to excessive flow of water of gaula river from banbhulpura railway crossing to gola bridge under lalkuan assembly constituency of nainital district. (awaiting a
Under the state plan, reconstruction and surface improvement work of the road damaged due to excessive flow of water of gaula river from banbhulpura railway crossing to gola bridge under lalkuan assembly constituency of nainital district. (awaiting a
Read moreProviding and installation of mechanical gates on gaddi nallah crossing sidhpur bundh fpe to the back flow of flood water during the monsoon season in distt gurdaspur
Providing and installation of mechanical gates on gaddi nallah crossing sidhpur bundh fpe to the back flow of flood water during the monsoon season in distt gurdaspur
Read more01(w)/edch/2024-25
Repairing and replacement of damaged line, pole and other materials due to storm in area of edd-i hapur
Read more03(w)/edch/2024-25
Repairing and replacement of damaged line,pole and other materials due to storm in area of edd-garh
Read moreMaintenance of water supply in sattari taluka urgent shifting of pipelines due to reconstruction of minor bridge at sawarcem vp bhiroda in poriem constituency
Maintenance of water supply in sattari taluka urgent shifting of pipelines due to reconstruction of minor bridge at sawarcem vp bhiroda in poriem constituency
Read moreWbhidco/gm e-ii/aa-ii/nit-04/2024-2024
Providing and laying median kerb over separator of street no 568 n s corridor airport bound lane from ch 00 to ch 17000 including restoration of damaged portion due to laying of gas pipe line under separator adjacent road in action area iib new town
Read moreProviding inlet cum bridge ...
Due to non-construction of inlet structures at rd. 82000 of kaithal drain during rainy season flood water in adrain causes heavy damage to the bank of kaithal drain. due to non-construction of inlet cum bridge structure at point and heavy di
Read moreWork of replacement of damaged 33 kv cable in 33 11 kv substation and damaged undergrounding cable of railway crossing and noc by railway under b.p plan 2024-25 under edd ii shahganj machhalishahar jaunpur
Work of replacement of damaged 33 kv cable in 33 11 kv substation and damaged undergrounding cable of railway crossing and noc by railway under b.p plan 2024-25 under edd ii shahganj machhalishahar jaunpur
Read moreof your Industry type